Santa Susana
Surface Water
Monitoring Locations
Outfall 002 South Slope below R2-A Pond
Stormwater discharges from Outfall 002 flow to Bell Creek. Stormwater flows are estimated to be 11 million gallons per day for a 1 year, 24 hour storm event. Activities conducted to control sediment erosion and improve water quality include:
- Hydromulching
- Straw wattles
- Straw bales
This is in addition to the stormwater control measures in place at the upstream Outfall 18 location.
