Santa Susana

Surface Water

Monitoring Locations

Outfall 002 South Slope below R2-A Pond

Outfall 002

Stormwater discharges from Outfall 002 flow to Bell Creek. Stormwater flows are estimated to be 11 million gallons per day for a 1 year, 24 hour storm event. Activities conducted to control sediment erosion and improve water quality include:

  • Hydromulching
  • Straw wattles
  • Straw bales

This is in addition to the stormwater control measures in place at the upstream Outfall 18 location.