| IATA/ICAO CODE: |
AHO/LIEA |
| CITY: |
Alghero |
| COUNTRY: |
Italy |
AIRPORT CONTACT
Information updated by ENAC 2/2011
| Name: |
Dr. Vincenzo Fusco |
Dr. Pier Paolo Sale |
| Title: |
Airport Director ENAC |
Coordinator ENAC |
Airport:
|
Alghero Fertilia Airport |
Alghero Fertilia Airport |
Address:
|
Aeroporto di Alghero
07040 Loc. S. Maria La Palma (Sassari)
Italy |
| Phone: |
+39 079 9369700 |
+39 079 9369705 |
| Fax: |
+39 079 9369720 |
+39 079 9369720 |
| Email: |
v.fusco@enac.gov.it |
p.sale@enac.gov.it |
| Airport Web Site: www.enac.gov.it |
ELEVATION: 27 (m)
|
RUNWAY INFORMATION
|
| Orientation |
Length(m)
|
Displaced
Threshold(m )
|
Glide Slope(deg)
|
Width(m)
|
| 02/20 |
3000
|
-
|
-
|
45
|
NOISE ABATEMENT PROCEDURES - NONE
CONTINUOUS DESCENT ARRIVAL (CDA)
- NONE
AIRPORT CURFEWS
Only for training flights on the field 1330-1630(LT from 15 Jun to 15 Sep only) and 2000-0800 all the year (LT 2130-0800 from 15 June to 15 Sep) TRAINING FLIGHTS TOUCH AND GO NOT ALLOWED FOR ACFT WITH MTOM GREATER THAN 10 TONS
|
PREFERENTIAL RUNWAYS
Rwy 02 for take off and Rwy 20 for landings.
Rwy 02 mandatory take off for Chapter 2 aircraft (except for safety
reason) |
OPERATING QUOTA - NONE
ENGINE RUN-UP RESTRICTIONS
| Same hours as for training flights. Also runups are not allowed
on aprons. |
APU OPERATING RESTRICTIONS
| APU start-up can not begin earlier than 60 minutes from the STD
and must finish within 20 minutes after landing. |
NOISE BUDGET RESTRICTIONS - NONE
NOISE SURCHARGE
- NONE
NOISE MITIGATION/LAND
USE PLANNING PROGRAM INFORMATION
|
Type of Program
|
Date Implemented
|
Status
|
| Sound Insulation (Residences and Public
Buildings) |
-
|
none reported |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
-
|
none reported |
| Avigation Easements |
-
|
none reported |
| Zoning Laws |
-
|
none reported |
| Real Estate/Property Disclosure Laws |
-
|
none reported |
| Acquire Land for Noise Compatibility to
date |
-
|
none reported |
| Population within each noise contour level
relative to aircraft operations |
-
|
none reported
|
| Airport Noise Contour Overlay Maps |
-
|
none reported |
| Total Cost of Noise Mitigation Programs
to Date |
-
|
none reported
|
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
-
|
none reported |
NOISE MONITORING SYSTEM
| A monitoring system will be installed in this year. |
FLIGHT
TRACK MONITORING SYSTEM - NONE
NOISE LEVEL LIMITS
| The limits will be established by the local Commission as described
under the noise compatibility program section. |
CHAPTER 2 RESTRICTIONS
| Chapter 2 airplanes >75,000 lbs are banned from
operating at airports in EU Member States as of April 1, 2002. |
CHAPTER 2 PHASEOUT
| From April 1, 2002 all civil subsonic jet aeroplanes >75,000
lbs operating at airports in EU Member States must comply with the
standards specified in Part II, Chapter 3, Volume 1 of Annex 16
in accordance with EU Council Directive 92/14/EEC. |
CHAPTER 3 RESTRICTIONS - NONE |