Bergamo Orio al Serio Airport

IATA/ICAO CODE: BGY/LIME
CITY: Orio al Serio
COUNTRY: Italy

AIRPORT CONTACT

No changes reported by the airport in 2008
Verify information below with the airport
Name: ENAC (Civil Aviation Authority)
Title:  
Airport: Bergamo Orio al Serio Airport
Address:



ENAC (Civil Aviation Authority)
Via Aeroporto, 13
24050 Aeroporto civile Bergamo/Orio al Serio
Italy
Phone: +39 035 326331 or + 39 035 326326
FAX: +39 035 313432
Email: aero.bergamo@enac.rupa.it
Airport Web Site: www.orioaeroporto.it

ELEVATION: 782 ft.
RUNWAY INFORMATION
Orientation
Length(m)

Displaced
Threshold(m)

Glide Slope(deg)
Width(m)
10/28
2934
10/100
28/133
-
45
12/30
778
-
-
30

NOISE ABATEMENT PROCEDURES
Noise abatement procedures (Provision of Italian Civil Aviation Authority N 42/674/A3 dated March 21, 1996

19.1 Initial climb procedures
Compliance with the procedures below shall not be required in adverse weather conditions or for safety reasons.

During the initial climb phase pilots shall maintain the following parameters:
a) up to 1500 ft QFE:
- take-off power
- takeoff flap
- climb V2+10/20 kt IAS or as limited by body angle
b) at 1500 ft QFE
- reduce thrust and climb at V2+ 10/20 kt IAS until reaching 3000 ft QFE
c) at 3000 ft QFE
- accelerate smoothly to en-route climb speed with flap retraction.

19.2 Approach and landing procedures

Pilots shall conduct their flight at a speed which permits operation of the aircraft in clean configuration until reaching a distance of approximately 12 NM from touch down.

Recommended speed is 210 kt + or - 10 KT or the aircraft's minimum performance speed if higher than above.

Subsequent portion of the approach, either instrument or visual, shall be flown with a properly set slope to achieve, if possible, a continuous descent, the interception of approach path not below 3000 ft QFE and aircraft to be established not beyond the OM or equivalent position.

Execution technique must be performed with aircraft deceleration action and aerodynamic configuration change so as to achieve final speed and configuration at the OM, FAF or equivalent position.

Compliance with the above procedure is recommended provided that it is compatible with ATC instructions and weather conditions are favorable.

Non compliance is allowed in case of precision approach CAT II and III.

No instrument or visual approach shall be made at an angle less than the ILS glide path or less than 3 degrees if no ILS is available.

Aircraft executing a visual approach shall intercept descent path at not lower than 1000 FT QFE.

19.3 Provisions of Italian Civil Aviation Authority N 42/255/R2/1-9 dated March 17, 1997
Noise abatement procedures described in paragraph 19.1 apply to the following aerodromes: Torino Caselle, Milano Linate, Milano Malpensa, Bergamo, Bologna, Ancona, Forli (only to RWY 30), Napoli, Pescara, Reggio Calabria (only to RWY 15/33), Rimini, Roma Ciampino, Roma Fiumicino (to RWY 25 excluded), Rinchi (only to TWY 09), Treviso S. Angelo (approved in Treviso AD by local DCA with provision n 404/2/32 dated 2 February 2001); noise abatement procedures described in paragraph 19.2 apply to all Italian aerodromes open to civil air traffic.

The use of the reverse thrust at power higher than idle is allowed only in the event of proven safety/operational reasons.

AIRPORT CURFEWS - NONE

PREFERENTIAL RUNWAYS

Runway Preferential Use:
RWY 10/28 (see information below under Use of RWY below)
RWY 12/30: bi-engine aircraft shall take off from RWY 20 and land on RWY 12

Use of RWY:

1)Departures

a) VFR traffic taking off from RWY shall follow the same IFR initial climb procedure with visual reference to the motorway toll gate:

b) Aircraft certified ICAO Annex 16 Chapter 2 can not use the airport except for emergency flights.

c) To assign the proper take off runway, all pilots must declare the ICAO Annex 16 Chapter of certification of their aircraft.

Night Restrictions:

From 2200 - 0500 (2100-0400) all traffic shall be instructed to take off from RWY 10 except for:

i) Weather conditions that recommend to use RWY 28
ii) Low visibility procedures
iii) Safety reasons or for air transport service exceptional reasons
iv) Diverting aircraft

Other reasons cannot be accepted (Ref provision of Malpensa CAA n7/90 dated 14/12/90)
Undetermined delay may be expected.

OPERATING QUOTA- NONE

ENGINE RUN-UP RESTRICTIONS
Run-ups are not permitted between 2200 to 0500 (2100 - 0400) and from 1300 to 1500 (1200-1400) local time except for airplanes that will be used immediately provided that safety conditions are observed. There are some exceptions with prior approval, contact the local Civil Aviation Authority for details.

APU OPERATING RESTRICTIONS
Use of APU is allowed 5 minute before EOBT but only to start up engines, in case of extraordinary reasons, the use of APU shall be reduced to the shortest time. If ground generator units are not available, APU can be started up 30 minutes before EOBT and switched off 20 minutes after arrival.

NOISE BUDGET RESTRICTIONS - NONE

NOISE SURCHARGE

Noise Pollution Environmental Tax

NOISE MITIGATION/LAND USE PLANNING PROGRAM INFORMATION
Type of Program
Date Implemented
Status
Sound Insulation (Residences and Public Buildings)
-
-
Purchase Assurance for Homeowners Located Within the Airport Noise Contours
-
-
Avigation Easements
-
-
Zoning Laws
-
-
Real Estate/Property Disclosure Laws
-
-
Acquire Land for Noise Compatibility to date
-
-
Population within each noise contour level relative to aircraft operations
-

-

Airport Noise Contour Overlay Maps
-
-
Total Cost of Noise Mitigation Programs to Date
-

-

Source of Noise Mitigation Program Funding for Aircraft Noise
-
-

NOISE MONITORING SYSTEM - NONE

FLIGHT TRACK MONITORING SYSTEM - NONE

NOISE LEVEL LIMITS - NONE

CHAPTER 2 RESTRICTIONS
Chapter 2 airplanes >75,000 lbs are banned from operating at airports in EU Member States as of April 1, 2002.

CHAPTER 2 PHASEOUT
From April 1, 2002 all civil subsonic jet aeroplanes >75,000 lbs operating at airports in EU Member States must comply with the standards specified in Part II, Chapter 3, Volume 1 of Annex 16 in accordance with EU Council Directive 92/14/EEC.

CHAPTER 3 RESTRICTIONS - NONE