Bodo Airport

IATA/ICAO CODE: BOO/ENBO
CITY: Bodo
COUNTRY: Norway

AIRPORT CONTACT

No changes reported by the airport in 2009
Verify information below with the airport.
Name:  
Title: Airport Administration
Airport: Bodo
Address:



P.O. Box 814
N-8001
Bodo
Norway
Phone: +47 75 53 71 88/89/90 (Admin)
Fax: +47 75 53 71 85(Admin)
Email:  
Airport Web Site: www.avinor.no

ELEVATION: 42 ft.
RUNWAY INFORMATION
Orientation
Length (m)
Displaced
Threshold (ft)
Glide Slope(deg)
Width (m)
7/25
2794
-
07/3
25/3.5
45

NOISE ABATEMENT PROCEDURES
See AIP Norway ENBO AD2.21
Overflying of the town shall not be made below 3000 ft. Follow TWR instructions.

AIRPORT CURFEWS - NONE

PREFERENTIAL RUNWAYS
Only applicable as long as wind conditions and traffic permits - to minimize noise in the city area.

Departures: 25
Arrivals: 07

OPERATING QUOTA - NONE

ENGINE RUN-UP RESTRICTIONS - NONE

APU OPERATING RESTRICTIONS- NONE

NOISE BUDGET RESTRICTIONS - NONE

NOISE SURCHARGE
2/2008 IATA Airport & Air Navigation Charges Manual
Take-Off Charge
Rate/tonne
A/C over 8 tonnes  

First 100,000 tonnes

NOK 95.00 per tonne

Over 100,000 tonnes

NOK 47.50 per tonne over 100 tonnes
Night Surcharge: Between 2400-0559 hours - 50% of take-off charge for each take-off and landing.
Noise Surcharge
Jet aircraft not complying with
ICAO Annex 16
NOK 3,789.00 per take-off
Aircraft complying with
ICAO Annex 16 Chapter 2
NOK 1,894.00 per take-off
Aircraft complying with
ICAO Annex 16 Chapter 3
No surcharge
The noise surcharge is increased by 50% between 2000 and 0800 local time.

NOISE MITIGATION/LAND USE PLANNING PROGRAM INFORMATION
Type of Program
Date Implemented
Status
Sound Insulation (Residences and Public Buildings)
-
unknown
Purchase Assurance for Homeowners Located Within the Airport Noise Contours
-
unknown
Avigation Easements
-
unknown
Zoning Laws
-
unknown
Real Estate/Property Disclosure Laws
-
unknown
Acquire Land for Noise Compatibility to date
-
unknown
Population within each noise contour level relative to aircraft operations
-

unknown

Airport Noise Contour Overlay Maps
-
unknown
Total Cost of Noise Mitigation Programs to Date
-

unknown

Source of Noise Mitigation Program Funding for Aircraft Noise
-
unknown

NOISE MONITORING SYSTEM - NONE

FLIGHT TRACK MONITORING SYSTEM - NONE

NOISE LEVEL LIMITS - NONE

CHAPTER 2 RESTRICTIONS
See Chapter 2 Phase out.

CHAPTER 2 PHASEOUT

This airport is located in a country that is an ICAO Contracting State and as such, phased out Chapter 2 airplanes based on the ICAO recommendation (Resolution A28-3).

CHAPTER 3 RESTRICTIONS - NONE