| Type
of Program |
Date
Implemented |
Description |
Status |
| Noise Insulation: |
Defining of Hygiene Protective Area (HPA) around Sofia Airport |
April 2002 |
HPA was defined before completion of the
new runway construction. It was prepared on the basis of traffic
and fleetmix forecast for 2007 – 2008 and in accordance with
the Bulgarian Legislation. HPA is the territory within a contour
of 60 dB equivalent noise level. |
completed |
| Preparation of Noise Protection Project
for the Territory within the HPA |
November 2002 |
The project comprises survey and elaboration
of a concept of individual and group noise protection measures within
the HPA. • Individual Noise Protection measures: replacement
of the existing woodwork of resident buildings (inhabitable houses)
and 106 Primary School located in the HPA with aluminium windows
with index of noise insulation 35 dB or more; • Group
Noise Protection measures: construction of a noise protection fence
on the Sofia Airport engine run-up pad. |
completed |
| Preparation of a Program for implementation
of the noise protection measures envisaged in the project |
October 2003 |
Program, based on the Project, describes
the implementation of the noise protection measures in the time |
completed |
| Implementation of the noise
protection measures |
2004 |
Noise insulation of 106 Primary School
located in the HPA |
completed September
2004 |
| 2005
- 2006 |
Noise insulation of
all resident buildings (inhabitable houses) within the Western part
of the HPA by replacement of the existing woodwork with aluminum
windows |
completed
April 2006 |
| |
2007 |
Noise insulation of all resident buildings (inhabitable
houses) within the Eastern part of the HPA by replacement of the
existing woodwork with aluminum windows |
completed December 2008 |
| |
2007 - 2008 |
Construction of noise protection fence on the Sofia
Airport engine run-up pad |
completed April 2009 |
| Aviation Noise Monitoring and Flight Tracking
System – property of Sofia Airport EAD |
January 2005 |
Noise Monitoring and Flight Tracking System
was purchased in August 2004, installed in November 2004, Sofia
Airport staff was trained in December 2004 and now the system is
operational. |
completed |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
- |
N/A |
- |
| Avigation Easements |
- |
N/A |
-
|
| Zoning Laws |
- |
N/A |
- |
| Real Estate/Property Disclosure Laws |
- |
N/A |
- |
| Acquire Land for Noise Compatibility to date |
- |
N/A |
- |
| Population within each noise contour level relative
to aircraft operations |
- |
We do not have specific data for each noise contour
level.
According to the Noise Protection Project the population within
the noise contour of 60 dB equivalent noise level is approximately
1650 people.
|
- |
| Airport Noise Contour Overlay Maps |
- |
Since January 2005 Sofia Airport has been operating
a Noise Monitoring System. Actual noise contours will be produced
in accordance with the Bulgarian Legislation. |
- |
| Total Cost of Noise Mitigation Programs to Date |
2004 |
• Noise Monitoring System – 250 000 Euro;
• Noise Insulation of 106 Primary School – 50 000 Euro;
• Noise Insulation of resident buildings within the Western
part of the HPA –350 000 Euro;
• Noise Insulation of resident buildings within the Eastern
part of the HPA – approx. 30 000 Euro;
|
- |
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
- |
Airport Taxes |
- |