| IATA/ICAO CODE: |
CHO/KCHO |
| CITY: |
Charlottesville |
| STATE: |
VA |
| COUNTRY: |
USA |
AIRPORT CONTACT
No changes reported by the airport in 2011
Verify information below with the airport
| Name: |
Barbara Hutchinson |
| Title: |
Executive Director |
| Airport: |
Charlottesville-Albermarle Airport |
Address:
|
100 Bowen Loop, Suite 200
Charlottesville, VA 22911 |
| Phone: |
+1 434 973 8342 |
| Fax: |
+1 434 974 7476 |
| Email: |
bhutchinson@gocho.com |
| Airport Web Site:
www.gocho.com |
ELEVATION: 641 ft.
NOISE ABATEMENT PROCEDURES - NONE
CONTINUOUS DESCENT ARRIVAL
(CDA) - NONE
AIRPORT CURFEWS - NONE
PREFERENTIAL RUNWAYS - NONE
OPERATING QUOTA - NONE
ENGINE RUN-UP RESTRICTIONS
APU OPERATING RESTRICTIONS - NONE
NOISE BUDGET RESTRICTIONS - NONE
NOISE SURCHARGE - NONE
NOISE MITIGATION/LAND
USE PLANNING PROGRAM INFORMATION
|
Type of Program
|
Date Implemented
|
Status
|
| Sound Insulation (Residences and Public
Buildings) |
none
|
None as all 65 DNL contour is within the
airport property. |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
none
|
- |
| Avigation Easements |
none
|
- |
| Zoning Laws |
-
|
The County of Albemarle has an airport
overlay district in their zoning law. |
| Real Estate/Property Disclosure Laws |
-
|
Two nearby housing developments (outside
the 65 DNL contour) have real estate disclosure statements included
in all public information including land records. |
| Acquire Land for Noise Compatibility to
date |
none
|
- |
| Population within each noise contour level
relative to aircraft operations |
none
|
-
|
| Airport Noise Contour Overlay Maps |
none
|
The 65 DNL contour is within the airport
property. |
| Total Cost of Noise Mitigation Programs
to Date |
none
|
- |
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
none
|
- |
NOISE
MONITORING SYSTEM - NONE
FLIGHT
TRACK MONITORING SYSTEM - NONE
NOISE LEVEL LIMITS - NONE
STAGE 2 RESTRICTIONS
| Stage 2 airplanes >75,000 lbs are prohibited from operating
at airports within the 48 contiguous states. |
STAGE 2 PHASEOUT
STAGE 3 RESTRICTIONS - NONE
|