| IATA/ICAO CODE: |
DOH/OTBD |
| CITY: |
Doha |
| COUNTRY: |
Qatar |
AIRPORT CONTACT
No changes reported by the airport in 2008 Verify information below with the airport
| Name: |
|
|
| Title: |
Civil Aviation Authority |
Chairman of the Board and Managing Director |
| Airport: |
Doha International |
|
Address: |
Civil Aviation Authority
P.O. Box 3000
Doha Qatar |
|
| Phone: |
+974 442 6262 |
+974 455 7333 |
| Fax: |
+974 442 9070 |
+974 455 2233 |
| Email: |
|
|
| Airport Web Site: www.dohaairport.com |
ELEVATION: 35 ft.
|
RUNWAY INFORMATION
|
| Orientation |
Length (m)
|
Displaced
Threshold (m)
|
Glide Slope(deg)
|
Width (m)
|
| 34/16 |
See Notes Below
|
35/750
|
3
|
46
|
|
Notes:
Runway 34: Landing/Take-off distance 4572 meters
Runway 16: Landing distance available 3822 meters
Runway 16: Take-off run available 4572 meters
|
NOISE ABATEMENT PROCEDURES
No restriction on noise abatement.
Between 1900 and 0300 UTC daily the following procedures are in
force: |
Arrivals |
When the wind velocity is 5 kt or less,
all landings are to be made on runway 34 |
Departures |
Aircraft departing from runway 34 must continue on
runway heading until passing 4 DME or 3000 ft, whichever is the
earlier, before turning on track |
| Overflying the city of Doha prohibited below 1500
ft. |
AIRPORT CURFEWS - NONE
PREFERENTIAL RUNWAYS - NONE
OPERATING QUOTA - NONE
ENGINE RUN-UP RESTRICTIONS - NONE
APU OPERATING RESTRICTIONS - NONE
NOISE BUDGET RESTRICTIONS - NONE
NOISE SURCHARGE - NONE
NOISE MITIGATION/LAND
USE PLANNING PROGRAM INFORMATION
|
Type of Program
|
Date Implemented
|
Status
|
| Sound Insulation (Residences and Public
Buildings) |
-
|
- |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
-
|
- |
| Avigation Easements |
-
|
- |
| Zoning Laws |
-
|
- |
| Real Estate/Property Disclosure Laws |
-
|
- |
| Acquire Land for Noise Compatibility to
date |
-
|
- |
| Population within each noise contour level
relative to aircraft operations |
-
|
-
|
| Airport Noise Contour Overlay Maps |
-
|
- |
| Total Cost of Noise Mitigation Programs
to Date |
-
|
-
|
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
-
|
- |
NOISE MONITORING SYSTEM - NONE
FLIGHT
TRACK MONITORING SYSTEM - NONE
NOISE LEVEL LIMITS - NONE
CHAPTER 2 RESTRICTIONS
CHAPTER 2 PHASEOUT
|
This airport is located in a country that is an ICAO Contracting
State. It is not known if this country adopted the ICAO recommendation
(Resolution A28-3) for the phase out of Chapter 2 airplanes.
|
CHAPTER 3 RESTRICTIONS - NONE
|