Dubrovnik Airport

IATA/ICAO CODE: DBV/LDDU
CITY: Dubrovnik
COUNTRY: Croatia

AIRPORT CONTACT

Information updated by the airport 3/2008
Name: Franc Luetic Tonci Peovic
Title: Deputy Director General General Director
Airport: Dubrovnik Airport Dubrovnik Airport
Address:

20213 Cilipi
Dubrovnik, Croatia
20213 Cilipi
Dubrovnik, Croatia
Phone: +385 20 773 333  
Fax: +385 20 773 322  
Email: fluetic@airport-dubrovnik.hr tpeovic@airport-dubrovnik.hr
Airport Web Site: www.airport-dubrovnik.hr

ELEVATION: 161 m
RUNWAY INFORMATION
Orientation
Length (m)
Displaced
Threshold (m)
Glide Slope(deg)
Width (m)
12/30
3300
12/150
12/3
30/3.2
45

NOISE ABATEMENT PROCEDURES

Runway 30

Take-off Procedure:

Take off to 460 m QNH: - take off power;
- take off flap;
- climb at V2 + 10 kt.

At 460m QNH:

 

 

 

 

 

 

 

- maintaining a positive rate of climb, accelerate to zero flap minimum safe maneuvering speed (V) retracting flap on schedule;

thereafter:

reduce thrust consistent with the following:

a) for high by-pass ratio engines to normal climb power/thrust;

b) for low by-pass ratio engines, to below normal climb power/thrust but not less than that necessary to maintain the final take-off engine-out climb gradient; and

c) for aeroplanes with slow flap retracting reduce power/thrust at an intermediate flap setting.

From 460m QNH to 1150m QNH: - continue climb at not greater than V + 20 kt.
At 1150m QNH: - accelerate smoothly to en-route climb speed.

Calculation of the SID is based on an all-engines operative minimum net climb gradient of 3.3 percent (201 FT/NM);

Where a greater climb gradient for a specific SID is necessary this is indicated in the description of the route.

If unable to comply with the prescribed SID, advise ATC prior to starting up engines.

AIRPORT CURFEWS - NONE

PREFERENTIAL RUNWAYS
Runway 12 is the preferential runway.

OPERATING QUOTA - NONE

ENGINE RUN-UP RESTRICTIONS - NONE

APU OPERATING RESTRICTIONS - NONE

NOISE BUDGET RESTRICTIONS - NONE

NOISE SURCHARGE - NONE

NOISE MITIGATION/LAND USE PLANNING PROGRAM INFORMATION
Type of Program
Date Implemented
Status
Sound Insulation (Residences and Public Buildings)
none
-
Purchase Assurance for Homeowners Located Within the Airport Noise Contours
none
-
Avigation Easements
none
-
Zoning Laws
none
-
Real Estate/Property Disclosure Laws
none
-
Acquire Land for Noise Compatibility to date
none
-
Population within each noise contour level relative to aircraft operations
none

-

Airport Noise Contour Overlay Maps
none
-
Total Cost of Noise Mitigation Programs to Date
none
-
Source of Noise Mitigation Program Funding for Aircraft Noise
none
-

NOISE MONITORING SYSTEM - NONE

FLIGHT TRACK MONITORING SYSTEM - NONE

NOISE LEVEL LIMITS - NONE

CHAPTER 2 RESTRICTIONS - UNKNOWN

CHAPTER 2 PHASEOUT

This airport is located in a country that is an ICAO Contracting State. It is not known if this country adopted the ICAO recommendation (Resolution A28-3) for the phase out of Chapter 2 airplanes. This country is currently an EU Member State Applicant and would be required to have all EU legislation transposed into national law upon entry into the EU. The EU Chapter 2 phase out for airplanes >75,000 was completed April 1, 2002.

CHAPTER 3 RESTRICTIONS - NONE