| IATA/ICAO CODE: |
HLP/WIHH |
| CITY: |
Jakarta |
| COUNTRY: |
Indonesia |
AIRPORT CONTACT
No changes reported by the airport in 2007 Verify information below with the airport
| Name: |
Mr. Sukamto Haryono |
Ahdi Agustian |
| Title: |
General Manager |
Division Manager of Operation Services |
| Airport: |
Halim Perdanakusumah International Airport |
Address:
|
Halim Perdanakusumah International Airport
Terminal Building, 2nd floor, Room: 244
Jakarta 13610, Indonesia |
| Phone: |
+62 21 808 99200 (0730-1630 Monday to Friday)
+62 21 809 0913 (24 Hours) |
| Fax: |
+62 21 809 3351 |
| Email: |
|
ahdi.agustian@centrin.net.id |
| Airport Web Site: |
ELEVATION: 84 ft.
| RUNWAY
INFORMATION |
| Orientation |
TORA (m) |
TODA (m) |
ASDA (m) |
LDA (m) |
Displaced
Threshold (m) |
Glide Slope(deg) |
Width (m) |
| 06 |
3000 |
3060 |
2940 |
2940 |
- |
3 |
45 |
| 24 |
3000 |
2860 |
3060 |
2800 |
200 |
- |
45 |
NOISE ABATEMENT PROCEDURES - NONE
AIRPORT CURFEWS - NONE
PREFERENTIAL RUNWAYS - NONE
OPERATING QUOTA - NONE
ENGINE RUN-UP RESTRICTIONS
| Wide-body aircraft shall be run-up on the runway and prior to
ATC clearance. |
APU OPERATING RESTRICTIONS - NONE
NOISE BUDGET RESTRICTIONS - NONE
NOISE SURCHARGE - NONE
NOISE MITIGATION/LAND
USE PLANNING PROGRAM INFORMATION
|
Type of Program
|
Date Implemented
|
Status
|
| Sound Insulation (Residences and Public
Buildings) |
-
|
- |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
-
|
- |
| Avigation Easements |
-
|
- |
| Zoning Laws |
-
|
- |
| Real Estate/Property Disclosure Laws |
-
|
- |
| Acquire Land for Noise Compatibility to
date |
-
|
- |
| Population within each noise contour level
relative to aircraft operations |
-
|
-
|
| Airport Noise Contour Overlay Maps |
-
|
- |
| Total Cost of Noise Mitigation Programs
to Date |
-
|
-
|
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
-
|
- |
NOISE MONITORING SYSTEM - NONE
FLIGHT
TRACK MONITORING SYSTEM - NONE
NOISE COMPATIBILITY PROGRAM - NONE
CHAPTER 2 RESTRICTIONS - UNKNOWN
CHAPTER 2 PHASEOUT
|
This airport is located in a country that is an ICAO Contracting
State. It is not known if this country adopted the ICAO recommendation
(Resolution A28-3) for the phase out of Chapter 2 airplanes.
|
CHAPTER 3 RESTRICTIONS - NONE
|