| IATA/ICAO CODE: |
FAR/KFAR |
| CITY: |
Fargo |
| STATE: |
ND |
| COUNTRY: |
USA |
AIRPORT CONTACT
Information updated by the airport 3/2008
| Name: |
Darren Anderson |
| Title: |
Assistant Director |
| Airport: |
Hector International Airport |
Address:
|
Hector International Airport
P.O. Box 2845
Fargo, ND 58108-2845 |
Physical Address (not for mailing)
2801 32nd Ave. NW
Fargo, ND 58108-2845 |
| Phone: |
+1 701 241 1501 |
| Fax: |
+1 701 241 1538 |
| Email: |
Darren@fargoairport.com |
| Airport Web Site: www.fargoairport.com |
ELEVATION: 902 ft.
|
RUNWAY INFORMATION
|
| Orientation |
Length (ft)
|
Displaced
Threshold (ft)
|
Glide Slope(deg)
|
Width (ft)
|
| 13/31 |
3800
|
-
|
-
|
150
|
| 18/36 |
9000
|
-
|
3
|
150
|
| 09/27 |
6300
|
-
|
-
|
100
|
Link
to FAA Airport Diagram Website
NOISE ABATEMENT PROCEDURES
| Noise Abatement agreement (voluntary procedures)
with airlines are as
follows:
Runway 18 departures for a East or South destination - fly runway
heading
to 4000ft then turn on course.
Runway 18 departures for West destination - turn on course. Runway
36
approach - five(5) miles straight in approach required.
If wind is 10 knots or less - depart Runway 36 and Approach Runway
18. |
AIRPORT CURFEWS - NONE
PREFERENTIAL RUNWAYS - NONE
OPERATING QUOTA - NONE
ENGINE RUN-UP RESTRICTIONS - NONE
APU OPERATING RESTRICTIONS - NONE
NOISE BUDGET RESTRICTIONS - NONE
NOISE SURCHARGE - NONE
NOISE MITIGATION/LAND
USE PLANNING PROGRAM INFORMATION
|
Type of Program
|
Date Implemented
|
Status
|
| Sound Insulation (Residences and Public
Buildings) |
N/A
|
- |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
N/A
|
- |
| Avigation Easements |
1980s
|
There are various avigation easements
in place for approach/runway safety areas. |
| Zoning Laws |
2002
|
New Land Development Code adopted by the
City of Fargo that includes an airport overlay district. |
| Real Estate/Property Disclosure Laws |
N/A
|
The state nor city currently do not have
a statute concerning this. |
| Acquire Land for Noise Compatibility to
date |
N/A
|
- |
| Population within each noise contour level
relative to aircraft operations |
-
|
Not Determined
|
| Airport Noise Contour Overlay Maps |
2000
|
Analyzed as part of the 2002 FAA Airport
Master Plan Update. |
| Total Cost of Noise Mitigation Programs
to Date |
N/A
|
-
|
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
N/A
|
N/A at this time. FAA AIP or PFC funds
would be used as necessary. |
NOISE MONITORING SYSTEM - NONE
FLIGHT
TRACK MONITORING SYSTEM - NONE
NOISE LEVEL LIMITS - NONE
STAGE 2 RESTRICTIONS
| Stage 2 airplanes >75,000 lbs are prohibited from operating
at airports within the 48 contiguous states. |
STAGE 2 PHASEOUT
STAGE 3 RESTRICTIONS - NONE
|