Incheon International Airport

IATA/ICAO CODE: ICN/RKSI
CITY: Seoul
COUNTRY: South Korea

AIRPORT CONTACT

No changes reported by the airport in 2008
Verify information below with the airport.
Name:  
Title:
Seoul Regional Aviation Administration
Airport: Incheon International Airport
Address:

Incheon International Airport
Ministry of Construction and Transportation
#2850 Unseo-dong
Jung-gu, Incheon
400-716
Republic of Korea
Phone: +82 32 740 2261 or +82 32 740 2192
Fax: +82 32 740 2269 or +82 32 740 2199
Email:  
Airport Web Site: www.airport.or.kr/eng/airport/

ELEVATION: 6.9 m
RUNWAY INFORMATION
Orientation
Length (m)
Displaced
Threshold (m)
Glide Slope(deg)
Width (m)
15L/33R
3750
-
-
60
15R/33L
3750
-
-
60

NOISE ABATEMENT PROCEDURES

Take-off
All departing aircraft should apply ICAO PANS-OPS (Doc 8168) Volume 1 Noise Abatement Take-off Climb Procedures as follows:

1. Runway 33 L/R:

- Noise Abatement Departure Procedure ONE (NADP One)

- Thrust reduction at 1500 ft above airport elevation recommended

2. Runway 15 L/R

- Noise Abatement Departure Procedure Two (NADP Two)

- Acceleration at 1000 ft above airport elevation recommended.

AIRPORT CURFEWS - NONE

PREFERENTIAL RUNWAYS - NONE

OPERATING QUOTA - NONE

ENGINE RUN-UP RESTRICTIONS - NONE

APU OPERATING RESTRICTIONS

1. At the Passenger docking stands:

- Primarily the stationary airport pneumatic and electrical service units shall be used.

- Alternatively, the airport owned mobile units shall be used.

2. At other stands:

- the airport owned mobile units shall be used.

3. Airborne APUs shall only be started:

- to start engine, the earliest 20 minutes before off-block time; however wide fuselage aircraft are permitted to use APU 60 minutes prior to scheduled departure time.

-if maintenance work on the aircraft makes it unavoidable; in that case the service period shall be kept as short as possible

- If the Airport owned units are not available or unserviceable for specific aircraft types; in that case the APUs shall be started at the earliest 60 minutes before off-block time and be kept in operation not more than 30 minutes after the on-block time.

In particular cases the Airport Corporation may permit longer service periods for APUs after the on-block time.

NOISE BUDGET RESTRICTIONS - NONE

NOISE SURCHARGE - NONE

NOISE MITIGATION/LAND USE PLANNING PROGRAM INFORMATION
Type of Program
Date Implemented
Status
Sound Insulation (Residences and Public Buildings)
-
-
Purchase Assurance for Homeowners Located Within the Airport Noise Contours
-
-
Avigation Easements
-
-
Zoning Laws
-
-
Real Estate/Property Disclosure Laws
-
-
Acquire Land for Noise Compatibility to date
-
-
Population within each noise contour level relative to aircraft operations
-

-

Airport Noise Contour Overlay Maps
-
-
Total Cost of Noise Mitigation Programs to Date
-

-

Source of Noise Mitigation Program Funding for Aircraft Noise
-
-

NOISE MONITORING SYSTEM - NONE

FLIGHT TRACK MONITORING SYSTEM - NONE

NOISE LEVEL LIMITS - NONE

CHAPTER 2 RESTRICTIONS - NONE

CHAPTER 2 PHASEOUT
This airport is located in a country that is an ICAO Contracting State. It is not known if this country adopted the ICAO recommendation (Resolution A28-3) for the phase out of Chapter 2 airplanes.

CHAPTER 3 RESTRICTIONS - NONE