| IATA/ICAO CODE: |
NBO/ |
| CITY: |
Nairobi |
| COUNTRY: |
Kenya |
AIRPORT CONTACT
No changes reported by the airport in 2007 Verify information below with the airport
| Name: |
M.S. Muriithi |
| Title: |
Managing Director |
| Airport: |
Jomo Kenyatta International Airport |
Address:
|
Jomo Kenyatta International Airport
P.O. Box 19001
Nairobi
Kenya |
| Phone: |
+254 2 82 54 01 9 |
| Fax: |
+254 2 82 20 78 |
| Email: |
muriithi@kenyaairports.co.ke |
| Airport Web Site: |
ELEVATION: 5327 ft.
|
RUNWAY INFORMATION
|
| Orientation |
Length (ft)
|
Displaced
Threshold (ft)
|
Glide Slope(deg)
|
Width (ft)
|
| 06/24 |
13507
|
-
|
-
|
148
|
NOISE ABATEMENT PROCEDURES
| To eliminate complaints of noise nuisance, particularly at
night, from those residents living in the suburbs of Nairobi,
the following instructions will be incorporated in ATC clearances
to high performance aircraft whose track necessitates a climb
out over the built up area of Nairobi.
Takeoff Runway 24:
a) Left turn after takeoff set course over the VOR (NV) or
b) Take up a VOT radial of 209 degree and maintain this radial
until reaching flight level 95 before commencing a right hand
turn.
Takeoff Runway 06:
a) Climb straight ahead to a height of 7500 feet QNH before
commencing a left hand turn.
Note: Standard Instrument Departure routes incorporate these
noise abatement procedures. |
AIRPORT CURFEWS - NONE
PREFERENTIAL RUNWAYS - NONE
OPERATING QUOTA - NONE
ENGINE RUN-UP RESTRICTIONS - NONE
APU OPERATING RESTRICTIONS - NONE
NOISE BUDGET RESTRICTIONS - NONE
NOISE SURCHARGE - NONE
NOISE MITIGATION/LAND
USE PLANNING PROGRAM INFORMATION
|
Type of Program
|
Date Implemented
|
Status
|
| Sound Insulation (Residences and Public
Buildings) |
-
|
unknown |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
-
|
unknown |
| Avigation Easements |
-
|
unknown |
| Zoning Laws |
-
|
unknown |
| Real Estate/Property Disclosure Laws |
-
|
unknown |
| Acquire Land for Noise Compatibility to
date |
-
|
unknown |
| Population within each noise contour level
relative to aircraft operations |
-
|
unknown
|
| Airport Noise Contour Overlay Maps |
-
|
unknown |
| Total Cost of Noise Mitigation Programs
to Date |
-
|
unknown
|
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
-
|
unknown |
NOISE MONITORING SYSTEM - NONE
FLIGHT
TRACK MONITORING SYSTEM - NONE
NOISE LEVEL LIMITS - NONE
CHAPTER 2 RESTRICTIONS - UNKNOWN
CHAPTER 2 PHASEOUT
|
This airport is located in a country that is an ICAO Contracting
State. It is not known if this country adopted the ICAO recommendation
(Resolution A28-3) for the phase out of Chapter 2 airplanes.
|
CHAPTER 3 RESTRICTIONS - NONE
|