Kansai International Airport

IATA/ICAO CODE: KIX/RJBB
CITY: Osaka
COUNTRY: Japan

AIRPORT CONTACT

Information updated by the Japan Civil Aviation Bureau 5/2007
Name: Kazuki Sakamoto
Title: Noise Abatement Technology Office
Airport: Kansai International Airport
Address:



Civil Aviation Bureau
Ministry of Land, Infrastructure and Transport
2-1-3 Kasumigaseki, Chiyoda-ku
Tokyo 100-8918, Japan
Phone: +81 3 5253 8724
Fax: +81 3 5253 1658
Email: sakamoto-k26x@mlit.go.jp
Airport Web Site: www.mlit.go.jp/koku/english/02_international/kansai.html

ELEVATION: 17.4 ft.
RUNWAY INFORMATION
Orientation
Length (m)
Displaced
Threshold (m)
Glide Slope(deg)
Width (m)
06R/24L
3500
-
3.0
60
06L/24R
4000
3.0
60
August 2, 2007 - The second 4000-meter-long runway will begin the operation.

NOISE ABATEMENT PROCEDURES

In order to reduce aircraft noise in the vicinity of the airport, the following procedures shall be applied unless compliance of the procedures adversely affects the safety of the aircraft operations. If an aircraft is unable to follow the procedures below, the pilot should execute alternative procedures which are considered to be practically equivalent.

For take-off - NONE

For landing to RWY 06R/L

a) Delayed Flap Approach Procedure: Entend final landing flaps after leaving 1500ft
b) Make gear down after leaving 2500ft

Use of SIDs
In order to reduce aircraft noise around the airport, in principle, all departure
aircraft are requested to fly via the following SIDs during the hours from 1400 UTC (2300 JST) to 2100 UTC (0600 JST).

a) Take off from Runway 06 R/L :MAIKO FIVE DEPARTURE or
TOMO FIVE DEPARTURE

b) Take off from Runway 24 R/L: FERRY FOUR DEPARTURE or
TOMO WEST TWO DEPARTURE

AIRPORT CURFEWS - NONE

PREFERENTIAL RUNWAYS - NONE

OPERATING QUOTA - NONE

ENGINE RUN-UP RESTRICTIONS - NONE

APU OPERATING RESTRICTIONS

When an aircraft is using an aircraft parking stand with fixed power facilities, APU shall not be used outside the time periods specified below except when specifically acknowledged by the authority as necessary.

- Less than 30 minutes prior to the estimated off-block time.

- The minimum time required for switching over to the fixed power facilities
after arrival at the parking stand.

- For the minimum time required for aircraft maintenance purposes if needed

NOISE BUDGET RESTRICTIONS - NONE

NOISE SURCHARGE - NONE

NOISE MITIGATION/LAND USE PLANNING PROGRAM INFORMATION
Type of Program
Date Implemented
Status
Sound Insulation (Residences and Public Buildings)
-
-
Purchase Assurance for Homeowners Located Within the Airport Noise Contours
-
-
Avigation Easements
-
-
Zoning Laws
-
-
Real Estate/Property Disclosure Laws
-
-
Acquire Land for Noise Compatibility to date
-
-
Population within each noise contour level relative to aircraft operations
-

-

Airport Noise Contour Overlay Maps
-
-
Total Cost of Noise Mitigation Programs to Date
-

-

Source of Noise Mitigation Program Funding for Aircraft Noise
-
-

NOISE MONITORING SYSTEM - NONE

FLIGHT TRACK MONITORING SYSTEM - NONE

NOISE LEVEL LIMITS - NONE

CHAPTER 2 RESTRICTIONS
Chapter 2 jet powered aircraft operations are not allowed in Japan as of April 1, 2002.

CHAPTER 2 PHASEOUT
All Chapter 2 jet powered aircraft have been phase out in Japan as of April 1, 2002.

CHAPTER 3 RESTRICTIONS - NONE