| IATA/ICAO CODE: |
SVX/USSS |
| CITY: |
Ekaterinburg |
| COUNTRY: |
Russian Federation |
AIRPORT CONTACT
Information updated by the airport 2/2011
| Name: |
Evgeny Chudnovsky |
Mikhail Maximov |
Title:
|
CEO
|
Managing Director |
| Airport: |
Koltsovo Airport |
Koltsovo Airport |
Address:
|
Koltsovo Airport
Sputnikov, 6
Ekaterinburg, Russia 620025 |
Koltsovo Airport
Sputnikov, 6
Ekaterinburg, Russia 620025 |
| Phone: |
+7 343 345-36-76, 345-36-12 |
+7 343 345-36-11, 354-36-17 |
| Fax: |
+7 343 345-36-73 |
+7 343 345-39-66 |
| Email: |
airport@koltsovo.ru |
ryadovoi@koltsovo.ru |
| Airport Web Site: www.koltsovo.ru |
ELEVATION: 233.6 m
|
RUNWAY INFORMATION
|
| Orientation |
Length (m)
|
Displaced
Threshold (m)
|
Glide Slope(deg)
|
Width (m)
|
| 08R/26L |
3026
|
see note
|
-
|
53
|
| 08L/26R |
3004 |
see note
|
-
|
45
|
| Displaced threshold 26R and 26L for landing only. |
NOISE ABATEMENT PROCEDURES
Noise
Abatement Procedures During Take-off and Climbing Phase:
1. General provisions.
1.1 Noise abatement procedures during take-off and climbing
phase shall be executed by crews of all aircraft during take-off
on RWY heading 260°/256°MAG.
1.2 Noise abatement procedures shall not be executed at the expense
of reduction of flight safety.
1.3 Noise abatement procedures shall not be executed in case of
one of the aircraft engines failure during take-off phase.
1.4 Noise abatement procedures include maintaining the established
TMA departure pattern.
2. Restrictions.
2.1 Take-off of aircraft with a tail-wind component shall be allowed
within the restrictions of the Aeroplane Flight Manual.
2.2 Changing of the aircraft flight direction (course) after take-off
is permitted only after reaching flight height of (200)m AAL.
2.3 The minimum indicated air speed during established climb shall
not be less than V2+20 km/h or less than that prescribed in the
Aeroplane Flight Manual if it has greater value.
2.4 Maintaining of the minimum indicated air speed during climb
is not required if it brings to exceeding of the minimum permissible
angle of attack.
2.5 The reduction of engines power shall not be applied until:
- the aircraft reaches (200) m AAL;
- the established standard power mode enables with maximum certified
take-off mass to maintain the established climb gradient of
not less than 3,3 % at a speed
specified above in para. 2.2 and 2.3;
- the established standard power mode enables with maximum certified
take-off mass to maintain the established climb gradient of
not less than 3,3 % at a speed
specified above in para. 2.2 and 2.3;
- take-off flight path provides overlying of all obstacles located
under flight path with sufficient clearance both when all engines
operate normally and also taking into account possible engine
failure and time period necessary for the rest engines to develop
full power.
3. Special take-off procedures.
The crews of aircraft shall apply two special take-off and climb
procedures: NADP 1 and NADP 2, and the pilotin- command may use
any of them for reaching necessary effect (ICAO Doc 8168, Volume
I, Part V, Chapter 3)
Noise Abatement Procedures During Approach Phase:
Noise abatement procedures during approach phase are not envisaged
|
CONTINUOUS DESCENT ARRIVAL
(CDA) - NONE
AIRPORT CURFEWS - NONE
PREFERENTIAL RUNWAYS - NONE
OPERATING QUOTA - NONE
ENGINE RUN-UP RESTRICTIONS
| Engines warm-up before take-off shall be carried out at RWY holding
position by ATS clearance. |
APU OPERATING RESTRICTIONS - NONE
NOISE BUDGET RESTRICTIONS - NONE
NOISE SURCHARGE - NONE
NOISE MITIGATION/LAND
USE PLANNING PROGRAM INFORMATION
|
Type of Program
|
Date Implemented
|
Status
|
| Sound Insulation (Residences and Public
Buildings) |
-
|
- |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
-
|
- |
| Avigation Easements |
-
|
- |
| Zoning Laws |
-
|
- |
| Real Estate/Property Disclosure Laws |
-
|
- |
| Acquire Land for Noise Compatibility to
date |
-
|
- |
| Population within each noise contour level
relative to aircraft operations |
-
|
-
|
| Airport Noise Contour Overlay Maps |
-
|
- |
| Total Cost of Noise Mitigation Programs
to Date |
-
|
-
|
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
-
|
- |
NOISE MONITORING SYSTEM - NONE
FLIGHT
TRACK MONITORING SYSTEM - NONE
NOISE LEVEL LIMITS - NONE
CHAPTER 2 RESTRICTIONS - NONE
CHAPTER 2 PHASEOUT
|
This airport is located in a country that is an ICAO Contracting
State. It is not known if this country adopted the ICAO recommendation
(Resolution A28-3) for the phase out of Chapter 2 airplanes.
|
CHAPTER 3 RESTRICTIONS - NONE
|