| IATA/ICAO CODE: |
HRL/KHRL |
| CITY: |
Harlingen |
| STATE: |
TX |
| COUNTRY: |
USA |
AIRPORT CONTACT
Information updated by the airport 2/2011
| Name: |
Bryan J. Wren |
T. Michael Browning, A.A.E. |
| Title: |
Asst. Director of Aviation |
Director of Aviation |
| Airport: |
Valley International Airport |
Valley International Airport |
Address:
|
Valley International Airport
Airport Terminal, 3rd Floor
3002 Heritage Way
Harlingen TX, 78550 |
Valley International Airport
Airport Terminal, 3rd Floor
3002 Heritage Way
Harlingen TX, 78550 |
Phone:
|
+1 956 430 8605 |
+1 956 430 8605 |
| Fax: |
+1 956 430 8619 |
+1 956 430 8619 |
Email:
|
bryan@flythevalley.com |
michael@flythevalley.com |
| Airport Web Site: www.flythevalley.com |
ELEVATION: 36 ft.
NOISE ABATEMENT
PROCEDURES - NONE
CONTINUOUS DESCENT
ARRIVAL (CDA) - NONE
AIRPORT CURFEWS - NONE
PREFERENTIAL RUNWAYS
Runway 17 - Approaches to South
Runway 31 - Approaches to North
Runway 35 - Departures to North
Runway 13 - Departures to South |
OPERATING QUOTA - NONE
ENGINE RUN-UP RESTRICTIONS - NONE
APU OPERATING RESTRICTIONS - NONE
NOISE BUDGET RESTRICTIONS - NONE
NOISE SURCHARGE - NONE
NOISE MITIGATION/LAND
USE PLANNING PROGRAM INFORMATION
|
Type of Program |
Date Implemented |
Status |
| Sound Insulation (Residences and Public
Buildings) |
- |
- |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
- |
- |
| Avigation Easements |
- |
- |
| Zoning Laws |
- |
- |
| Real Estate/Property Disclosure Laws |
- |
- |
| Acquire Land for Noise Compatibility to
date |
- |
- |
| Population within each noise contour level
relative to aircraft operations |
- |
- |
| Airport Noise Contour Overlay Maps |
- |
- |
| Total Cost of Noise Mitigation Programs
to Date |
- |
- |
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
- |
- |
NOISE MONITORING SYSTEM - NONE
FLIGHT
TRACK MONITORING SYSTEM - NONE
NOISE LEVEL LIMITS - NONE
STAGE 2 RESTRICTIONS
| Stage 2 airplanes >75,000 lbs are prohibited from operating
at airports within the 48 contiguous states. |
STAGE 2 PHASEOUT
STAGE 3 RESTRICTIONS - NONE |