Roanoke Regional Airport

IATA/ICAO CODE: ROA/KROA
CITY: Roanoke
STATE: VA
COUNTRY: USA

AIRPORT CONTACT

Information updated by the airport 2/2011

Name: Jacqueline Shuck Efren Gonzalez
Title: Executive Director Deputy Executive Director
Airport: Roanoke Regional Airport Roanoke Regional Airport
Address:


Roanoke Regional Airport Commission
5202 Aviation Drive
Roanoke, VA 24012-1148
Roanoke Regional Airport Commission
5202 Aviation Drive
Roanoke, VA 24012-1148
Phone:
+1 540 362 1999 +1 540 362 1999
Fax: +1 540 563 4838 +1 540 563 4838
Email:
jacques@roanokeairport.com EfrenG@roanokeairport.com
Airport Web Site: www.roanokeairport.com

ELEVATION: 1174.5 ft.
RUNWAY INFORMATION
Orientation
Length (ft)
Displaced
Threshold (ft)
Glide Slope(deg)
Width (ft)
6/24
6800
24/6012
-
150
16/34
5810
-
-
150
Note: Runway 6/24 arrivals and departures are noise sensitive.
Check FAA Airport Diagrams for current information.

NOISE ABATEMENT PROCEDURES - NONE

CONTINUOUS DESCENT ARRIVAL (CDA) - NONE

AIRPORT CURFEWS - NONE

PREFERENTIAL RUNWAYS - NONE

OPERATING QUOTA - NONE

ENGINE RUN-UP RESTRICTIONS
Run ups prohibited 10 pm to 6 am.

APU OPERATING RESTRICTIONS - NONE

NOISE BUDGET RESTRICTIONS - NONE

NOISE SURCHARGE - NONE

NOISE MITIGATION/LAND USE PLANNING PROGRAM INFORMATION
Type of Program
Date Implemented
Status
Sound Insulation (Residences and Public Buildings)

Sound Insulation - Phase IA
Sound Insulation – Phase 1B
Sound Insulation – Phase 2
Sound Insulation – Phase 3
Sound Insulation – Phase 4
1986


2006
2007
2008
2009
2010

14 homes completed
(City of Roanoke Project)

21 homes completed.
15 homes completed
40 homes completed
36 homes completed
17 homes completed

Purchase Assurance for Homeowners Located Within the Airport Noise Contours
2003
13 easements acquired
Avigation Easements
2003-2010
147 easements acquired (includes P.A.)
Zoning Laws
-
N/A
Real Estate/Property Disclosure Laws
-
N/A
Acquire Land for Noise Compatibility to date
-
Information incomplete at this time.
Population within each noise contour level relative to aircraft operations
2000

327

Airport Noise Contour Overlay Maps
2000
2005
2000 DNL Contours
2005 DNL Contours
Total Cost of Noise Mitigation Programs to Date
1986-2002

2003-2011

Approximately $500,000

Approximately $7 million

Source of Noise Mitigation Program Funding for Aircraft Noise
-
AIP grants

NOISE MONITORING SYSTEM - NONE

FLIGHT TRACK MONITORING SYSTEM - NONE

NOISE LEVEL LIMITS - NONE

STAGE 2 RESTRICTIONS
Stage 2 airplanes >75,000 lbs are prohibited from operating at airports within the 48 contiguous states.

STAGE 2 PHASEOUT
U.S. Stage 2 Phase out complete as of 12/31/1999 (CFR Part 91.801). Stage 2 airplanes >75,000 lbs are prohibited from operating at airports within the 48 contiguous states.

STAGE 3 RESTRICTIONS - NONE