| IATA/ICAO CODE: |
RST/KRST |
| CITY: |
Rochester |
| STATE: |
MN |
| COUNTRY: |
USA |
AIRPORT CONTACT
Information updated by the airport 2/2011
| Name: |
Steve W. Leqve |
Kurt Claussen |
| Title: |
Airport Manager |
Assistant Airport Manager |
| Airport: |
Rochester International Airport |
Rochester International Airport |
Address:
|
Rochester International Airport
Helgerson Dr. SW
Rochester MN 55902 |
Rochester International Airport
Helgerson Dr. SW
Rochester MN 55902 |
Phone:
|
+1 507 282 2328 |
+1 507 282 2328 |
| Fax: |
+1 507 282 2346 |
+1 507 282 2346 |
Email:
|
rst@flyrst.com |
Kclaussen@flyrst.com |
| Airport Web Site: www.flyrst.com |
ELEVATION: 1317 ft.
NOISE ABATEMENT PROCEDURES - NONE
CONTINUOUS DESCENT
ARRIVAL (CDA) - NONE
AIRPORT CURFEWS
| Airport is closed to unscheduled air carrier operations from
2230 to 0600 except by prior arrangement with airport manager. This
is in place to make sure there is proper fire protection in place. |
PREFERENTIAL RUNWAYS - NONE
OPERATING QUOTA - NONE
ENGINE RUN-UP RESTRICTIONS - NONE
APU OPERATING RESTRICTIONS - NONE
NOISE BUDGET RESTRICTIONS - NONE
NOISE SURCHARGE - NONE
NOISE MITIGATION/LAND
USE PLANNING PROGRAM INFORMATION
|
Type of Program |
Date Implemented |
Status |
| Sound Insulation (Residences and Public
Buildings) |
- |
- |
| Purchase Assurance for Homeowners Located
Within the Airport Noise Contours |
- |
- |
| Avigation Easements |
- |
- |
| Zoning Laws |
- |
- |
| Real Estate/Property Disclosure Laws |
- |
- |
| Acquire Land for Noise Compatibility to
date |
- |
- |
| Population within each noise contour level
relative to aircraft operations |
- |
- |
| Airport Noise Contour Overlay Maps |
- |
- |
| Total Cost of Noise Mitigation Programs
to Date |
- |
- |
| Source of Noise Mitigation Program Funding
for Aircraft Noise |
- |
- |
NOISE MONITORING SYSTEM - NONE
FLIGHT
TRACK MONITORING SYSTEM - NONE
NOISE LEVEL LIMITS - NONE
STAGE 2 RESTRICTIONS
| Stage 2 airplanes >75,000 lbs are prohibited from operating
at airports within the 48 contiguous states. |
STAGE 2 PHASEOUT
STAGE 3 RESTRICTIONS - NONE |