Zvartnots Airport

IATA/ICAO CODE: EVN/UDYZ
CITY: Yerevan
COUNTRY: Armenia

AIRPORT CONTACT

Information updated by the airport 2/2011

Name: Sergey Nalbandyan
Title: Operations
Airport: Zvartnots Airport
Address:



Zvartnots - Airport Administration
Yerevan - 42
Republic of Armenia
Phone: +37410 493000 (internal 7228)
Fax: +37410 493000 (internal 7228)
Email: snalbandyan@aia-zvartnots.aero
Airport Web Site: www.aia-zvartnots.aero

ELEVATION: 2838 ft
RUNWAY INFORMATION
Orientation
Length(m)
Displaced
Threshold(m)
Glide Slope(deg)
Width(m)
07/27
3850
-
-
56

NOISE ABATEMENT PROCEDURES
There are established noise preferable routes which allow inbound and outbound aircraft to avoid flights above the airport adjacent areas susceptible to noise:

1. Runway 09 is the preferred runway for landing and Runway 27 for take-off.
2. In the case of take-off from Runway 27, turn is performed up to or after over flight above the city Etchmiadzin. It is not permitted to over fly the city of Etchmiadzin at low levels.
3. Take-off from Runway 09 (above Yerevan) is permitted in the presence of meteorological condition.

CONTINUOUS DESCENT ARRIVAL (CDA) - NONE

AIRPORT CURFEWS - NONE

PREFERENTIAL RUNWAYS - NONE

OPERATING QUOTA - NONE

ENGINE RUN-UP RESTRICTIONS - NONE

APU OPERATING RESTRICTIONS - NONE

NOISE BUDGET RESTRICTIONS - NONE

NOISE SURCHARGE - NONE

NOISE MITIGATION/LAND USE PLANNING PROGRAM INFORMATION
Type of Program
Date Implemented
Status
Sound Insulation (Residences and Public Buildings)
-
-
Purchase Assurance for Homeowners Located Within the Airport Noise Contours
-
-
Avigation Easements
-
-
Zoning Laws
-
-
Real Estate/Property Disclosure Laws
-
-
Acquire Land for Noise Compatibility to date
-
-
Population within each noise contour level relative to aircraft operations
-

-

Airport Noise Contour Overlay Maps
-
-
Total Cost of Noise Mitigation Programs to Date
-

-

Source of Noise Mitigation Program Funding for Aircraft Noise
-
-

NOISE MONITORING SYSTEM - NONE

FLIGHT TRACK MONITORING SYSTEM - NONE

NOISE LEVEL LIMITS - NONE

CHAPTER 2 RESTRICTIONS - NONE

CHAPTER 2 PHASEOUT - NONE

CHAPTER 3 RESTRICTIONS - NONE