Please note that these clauses are living documents, therefore an effective date is provided next to each clause. Sellers are advised that they are to use the clause in effect as of the original purchase contract date, unless specified otherwise. For clauses incorporated by a purchase contract change, use the clause in effect as of the purchase contract change date, unless specified otherwise. Questions regarding the clauses or need of resolution to conflicting requirements contained in your purchase contract should always be directed to your Boeing Procurement Agent.
Note: If the Quality Clause contained in the purchase contract is not found, it may be available at the following URL:
http://www.boeing.com/companyoffices/doingbiz/idscommon/clauses/clause_q.htm
| Q001 - Q199 | ||
|---|---|---|
| Q001 | 11/11/03 | Boeing Quality Management System (BQMS) Requirements: Appendix A, "Quality Management System", Addendum 1, "Advanced Quality System (AQS) Continuous Improvement", and Addendum 2, "Quality System Requirements for Software" |
| 10/01/01 | Boeing Quality Management System (BQMS) Requirements Appendix A and Addendum 1 and Addendum 2 | |
| Q002 | 11/11/03 | Boeing Quality Management System (BQMS) Requirements: Appendix A, "Quality Management System" and Addendum 1, "Advanced Quality System (AQS) Continuous Improvement" |
| 10/01/01 | Boeing Quality Management System (BQMS) Requirements Appendix A and Addendum 1 | |
| Q003 | 11/11/03 | Boeing Quality Management System (BQMS) Requirements: Appendix A, "Quality Management System," and Addendum 2, "Quality System Requirements for Software" |
| 10/01/01 | Boeing Quality Management System (BQMS) Requirements Appendix A and Addendum 2 | |
| Q004 | 11/11/03 | Boeing Quality Management System (BQMS) Requirements: Appendix A, "Quality Management System" |
| 10/01/01 | Boeing Quality Management System (BQMS) Requirements Appendix A | |
| Q005 | 11/11/03 | Boeing Quality Management System (BQMS) Requirements: Appendix B, "Inspection and Test Quality System" and Addendum 1, "Advanced Quality System (AQS) Continuous Improvement" |
| 10/01/01 | Boeing Quality Management System (BQMS) Requirements Appendix B and Addendum 1 | |
| Q006 | 11/11/03 | Boeing Quality Management System (BQMS) Requirements: Appendix B "Inspection and Test Quality System" |
| 10/01/01 | Boeing Quality Management System (BQMS) Requirements Appendix B | |
| Q006S | 06/05/08 | Report A0436 and AS9003, Inspection and Test Quality System |
| 08/01/05 | Report A0436 and AS9003, Inspection and Test Quality System | |
| Q007 | 11/23/05 | ISS Quality System Supplement |
| 12/14/01 | International Space Station Program Supplement to BQMS Appendix A -- Rev 12/14/01 | |
| Q008W | 11/23/05 | Software Quality Requirements For Airborne Systems And Equipment -- Deliverable |
| Q009 | 07/30/07 | ISO 9001 Quality Management Systems -- Requirements |
| Q009O | 05/12/05 | ISO 9001 Quality Management Systems -- Requirements |
| Q010 | 09/15/04 | Seller's Quality Control Requirements |
| Q010MM | 06/05/08 | Seller's Quality Control Requirements - Material / Standard Part Certification - Deliverable |
| Q010S | 11/23/05 | Seller's Quality Control Requirements -- Tubes |
| Q011 | reserved | |
| Q011P | 11/03/04 | Supplemental Quality Assurance Requirements |
| Q011S | 05/31/06 | Supplemental Quality Requirements |
| Q012 | 10/01/01 | Compliance with MIL-STD-45662A |
| Q012O | 08/22/05 | Calibration System And Notice Of Significant Out-Of-Tolerance Conditions |
| Q013 | 03/25/08 | Boeing Quality Management System (BQMS) Requirements: Appendix C, AS9110, Quality Maintenance Systems - Aerospace -- Requirements for Maintenance Organization |
| Q014 | 03/03/08 | Rebuild or Alteration - FAA Approved Production Approval Holder (PAH) Requirements -- Deliverable |
| Q015 | 11/19/07 | Maintenance, Repair, Overhaul, FAA Regulated Non-Certificated Requirements -- Deliverable |
| Q015W | 02/07/05 | Buyer Approved Quality System -- Repair Station Requirements |
| Q016 | 11/19/07 | Maintenance, Repair, Overhaul, FAA Regulated and Certificated Requirements -- Deliverable |
| Q016W | 02/07/05 | Buyer/Regulatory Agency Approved Repair Station -- FAR 14CFR145.217 Requirements |
| Q017 | reserved | |
| Q018 | 03/25/08 | Boeing Quality Management System (BQMS) Requirements: Appendix A, AS9100, Quality Management Systems - Aerospace - Requirements - Non-FAA Regulated Maintenance, Repair and Overhaul Services |
| Q019 | 06/21/04 | Approved Process Source -- Deliverable Documentation |
| 10/01/01 | Approved Process Source | |
| Q019W2 | 11/23/05 | Approved Processors - F/A-22 Program - Deliverable |
| Q020 | 06/21/04 | Approved Process Source |
| 10/01/01 | Approved Processors | |
| Q020S3 | 11/23/05 | Approved Process Source -- F/A-18 Program |
| Q020V6 | 02/22/08 | Israel Aerospace Industries (IAI) Special Processes - Arrow Program |
| 12/15/05 | ||
| Q021P | 04/18/05 | Quality Requirements For Critical / Process Sensitive Items |
| Q021S5 | 11/23/05 | Flight Safety Program / Production Plan -- AH-64 Program -- Deliverable |
| Q022M5 | 06/05/08 | Flight Safety / Critical Item Control -- AH-64 Program -- Deliverable |
| Q022S5 | 11/23/05 | Flight Safety / Critical Item Control -- AH-64 Program -- Deliverable |
| Q023-Q025 | reserved | |
| Q023M | 06/05/08 | Requirements for Flight Safety Critical Aircraft Parts (FSCAP) in the Maintenance, Overhaul And Remanufacture Environment Per EPB 17-120 - Deliverable |
| Q026P | 04/18/05 | Mark Packing Slip With Engineering Revision Level |
| Q027 | 04/18/05 | Procurement Control Drawing |
| 10/01/01 | ||
| Q027P | 04/18/05 | Dataset/Drawing Information (Variable) |
| Q028 | 04/18/05 | Production Drawing Information |
| 10/01/01 | ||
| Q029 | 07/02/07 | Digital Product Definition (DPD) / Model Based Definition (MBD) |
| 12/18/03 | Digital Product Definition (DPD) | |
| Q029H | 05/14/04 | Digital Product Definition (DPD) / Model Base Definition (MBD) |
| Q030 | 10/01/01 | Manufacturing and Inspection Control Plan |
| Q030K | 08/22/05 | Manufacturing Plan Required |
| Q030P | 04/18/05 | Quality Acceptance -- Buyer's Manufacturing Plan -- Deliverable |
| Q031 | 10/01/01 | Boeing's Review of Manufacturing Controls for Pyrotechnic Devices |
| Q032 | 11/23/05 | Key Characteristics |
| Q033-Q039 | reserved | |
| Q040 | 07/29/04 | Buyer Right of Entry and Surveillance |
| 10/01/01 | Boeing Right of Entry | |
| Q041 | 07/02/07 | Discretionary Government Surveillance |
| 10/01/01 | Government Right of Entry | |
| Q042 | 10/01/01 | Sub-purchase order/contract Fabrication |
| Q043-Q047 | reserved | |
| Q047V | 12/15/05 | Source Inspection Plan (SIP) - Deliverable |
| Q048 | 06/20/08 | United Space Alliance Customer Source Inspection -- Space Program Operations Contract |
| 03/16/05 | ||
| 06/05/02 | ||
| Q048S | 05/12/05 | Designated Customer Representative Inspection |
| Q048V6 | 02/22/08 | Right Of Entry For Israel Aerospace Industries (IAI) - Arrow Program |
| 12/15/05 | ||
| Q049 | 10/01/01 | Government Source Inspection |
| Q050 | 10/01/01 | Government Source Inspection -- NASA Program |
| Q051 | 10/01/01 | Boeing Inprocess & Final Source Inspection |
| Q052 | 10/01/01 | Boeing Final Source Inspection |
| Q053 | 09/15/04 | Buyer's Source Inspection Required |
| 10/01/01 | Buyer's Source Inspection Required | |
| Q053S3 | 11/23/05 | Seller And Buyer Inspection Required -- F/A-18 Program |
| Q054 | 10/01/01 | Boeing Quality Surveillance |
| Q055 | 10/01/01 | Boeing's Tooling Inspection at Seller's Plant |
| Q056 | 10/01/01 | Tooling Inspection and Reports by Seller |
| Q057 | 10/01/01 | Inspection Control Point Outline (Mandatory Inspection Points)(MIPs) |
| Q057V | 12/15/05 | Buyer's Mandatory Inspection Points |
| Q058 | 10/01/01 | FAA Inspection |
| Q058O | 08/22/05 | FAA Requirements -- Foreign Procurement |
| Q059 | 05/12/05 | Buyer And FAA Designee Conformity -- Deliverable Documentation |
| Q059W | 11/23/05 | Buyer And FAA Conformity -- Seller / Subcontractor -- Deliverable |
| Q060 | 05/12/05 | Buyer Completed FAA Form 8130-9 -- Deliverable |
| Q060W | 08/01/05 | NREE Conformity Request and FAA Form 8130-9 -- Deliverable |
| Q061K | 05/12/05 | FAA Statement Of Conformity -- NATDelegated -- Deliverable |
| Q062K | 05/12/05 | FAA Authorized Release Certificate -- Aviation Certification Consulting -- Deliverable |
| Q063 | 07/05/05 | FAA Requirements -- Deliverable Documentation |
| Q064W | 11/23/05 | Buyer FAA Conformity -- Seller / Subcontractor -- Deliverable |
| Q064-Q067 | reserved | |
| Q068K | 02/07/05 | Seller's First Article Inspection Requirement With Boeing First Article Inspection (BFAI) and Deliverable Report |
| Q069 | 10/01/01 | Objective Evidence of Dimensional Inspection |
| Q069K | 02/07/05 | Seller's First Article Inspection Requirement and Deliverable Report |
| Q070 | 10/01/01 | First-Piece Inspection |
| Q071 | 05/31/06 | AS9102 Aerospace First Article Inspection Requirement With Boeing First Article Inspection (BFAI) - Deliverable Report |
| 04/21/04 | AS9102 Aerospace First Article Inspection Requirement with Boeing First Article Inspection (BFAI) and Deliverable Report | |
| 05/13/02 | First Article Inspection (with Boeing Source) | |
| Q072 | 05/31/06 | AS9102 Aerospace First Article Inspection Requirement - Deliverable Report |
| 04/21/04 | AS9102 Aerospace First Article Inspection Requirement and Deliverable Report | |
| 12/10/02 | First Article Inspection (By Seller Only) | |
| Q073 | 04/21/04 | AS9102 Aerospace First Article Inspection Requirement |
| Q074 | 04/21/04 | AS9102 Aerospace First Article Inspection Requirement with Boeing First Article Inspection (BFAI) |
| Q075-Q077 | reserved | |
| Q078 | 07/29/04 | Electronic Quality Documentation Package (E-QDP) Supplier Portal |
| Q079 | 08/22/05 | Manufacturer Acceptance Test Reports -- Deliverable |
| 10/01/01 | Manufacturer Acceptance Test Reports | |
| Q078V6 | 12/15/05 | Delivery Data Package - Arrow Program |
| Q079S | 07/05/05 | Test Data Sheets -- Deliverable |
| Q080 | 10/01/01 | Raw Material Test Results |
| Q081 | 10/01/01 | Lot Inspection Report |
| Q082 | 10/01/01 | Single Lot-Date Code |
| Q083 | 10/01/01 | Date of Manufacture |
| Q084 | 10/01/01 | Limited Operating Life Items |
| Q085M | 06/05/08 | Maintenance Management and Historical Report Requirements for Army Aircraft Components - Deliverable |
| Q085-Q090 | reserved | |
| Q091 | 06/20/08 | Manufacturer's Certificate of Conformance |
|
08/24/06
10/01/01 |
Manufacturer's Certification | |
| Q091P | 05/31/06 | Certificate Of Conformance -- Deliverable |
| 03/16/05 | Certificate of Conformance | |
| Q091V | 12/15/05 | Certificate Of Conformance - Deliverable |
| Q091W | 03/16/05 | Certificate of Conformance -- Deliverable |
| Q092 | 10/01/01 | Item Material Certification |
| Q092W | 02/07/05 | Material Certification |
| Q093 | 10/01/01 | Certification of Compliance |
| Q094 | 10/01/01 | Certification of Compliance |
| Q095 | 10/01/01 | Preproduction Approval of Castings and Forgings |
| Q096-Q101 | reserved | |
| Q102 | 10/01/01 | Certificate of Solderability |
| Q103 | 10/01/01 | Nondestructive Test (NDT) Certification |
| Q104 | 10/01/01 | Testing of High-Strength Fasteners |
| Q104S | 02/07/05 | Quantitative Test Results |
| Q105 | 10/01/01 | High-Strength Fastener Certification |
| Q105S | 02/07/05 | Fastener Material Certification |
| Q106-Q111 | reserved | |
| Q112 | 06/03/05 | Serialization, Built-to-Specification |
| 05/14/04 | ||
| 10/01/01 | Serialization | |
| Q112H | 06/03/05 | Serialization, Built-to-Print |
| 05/14/04 | ||
| Q112P | 02/22/08 | Seller Serialization |
| 07/02/07 | ||
| 05/31/06 | ||
| 04/18/05 | ||
| Q112V6 | 12/15/05 | Serialization Requirements - Arrow Program |
| Q113 | 06/20/08 | Traceability -- Raw Material |
| 10/01/01 | ||
| Q114 | 10/01/01 | Lot Traceability -- Manufactured Goods |
| Q115 | 10/01/01 | Serial Number Traceability -- Manufactured Goods |
| Q116 | 10/01/01 | Traceability Data -- Subassembly |
| Q116S3 | 11/23/05 | Data Package Item E-54.18e - F/A-18 -- Deliverable |
| Q116W | 11/23/05 | Serialization And Traceability List For Fracture Critical Category I --Deliverable |
| Q117-Q121 | reserved | |
| Q122 | 10/01/01 | Electrostatic Sensitive Discharge Protection Program |
| Q123 | 10/01/01 | Electrostatic Discharge Protection |
| Q123W | 05/12/05 | Electrostatic Discharge (ESD) -- Packaging |
| Q124 | 07/21/08 | Static-Dissipative Packaging - Non-ESD Sensitive Goods |
| 10/01/01 | Antistatic/Static-Dissipative Packaging -- Non-ESD Sensitive Goods | |
| Q125 | 10/01/01 | Electrostatic Sensitive Discharge Protection Program |
| Q126 | 12/06/01 | Age Control |
| Q127-Q132 | reserved | |
| Q133 | 10/01/01 | Seller's EEE Part Certification |
| Q134 | 10/01/01 | EEE PRECAP Inspection |
| Q135-Q139 | reserved | |
| Q140 | 10/01/01 | Shipping to Destination other than Boeing's |
| Q141 | 10/01/01 | Documents Describing Goods Shipped |
| Q141PP | 06/03/05 | Seller Drawing/Catalog -- Deliverable |
| 04/18/05 | ||
| Q142 | 10/01/01 | Manufacturer's Commercial and Government Entity (CAGE) Code |
| Q143-Q149 | reserved | |
| Q150 | 09/21/06 | Process Validation Assessment |
| Q150P | 11/03/04 | Process Validation Assessment (PVA) |
| Q150S | 11/03/04 | Process Validation Assessment |
| Q150V | 12/15/05 | Process Validation Assessment |
| Q150W | 09/15/04 | Process Validation Assessment |
| Q151 | 06/20/08 | Buyer's Source Inspection - Precedence |
| 09/21/06 | Process Validation Assessment - Precedence | |
| Q151W | 09/15/04 | Limited Process Validation Assessment |
| Q152-Q169 | reserved | |
| Q170P | 04/18/05 | Destruct Test Unit Requirement |
| Q171P | 04/18/05 | Grain Flow Marking |
| Q172P | 04/18/05 | Commingling of Items |
| Q173-Q179 | reserved | |
| Q180S | 07/21/08 | Quality Assurance Requirements - Perishable Tooling |
| 11/23/05 | ||
| Q180V | 12/15/05 | Tooling Accountability |
| Q180W | 08/01/05 | Special Tool Control |
| Q181W | 12/15/05 | Requirements For Sellers Of Special Tools |
| Q185 | 09/17/07 | Quality Requirements Review |
| 08/25/06 | ||
| Q185H | 4/24/06 | Post Award Quality Conference |
| Q186-Q199 | reserved | |
| Q200 -- Q299 | ||
|---|---|---|
| Q200 | reserved | |
| Q201 | 4/19/01 | Government Source Inspection Requirements (NASA contracts -- Station Program) |
| Q202 | 6/4/01 | Government Source Inspection Contracts (SSME Program) |
| Q203 | 1/24/03 | Boeing Source Inspection |
| Q204 | 8/15/03 | Tin Plating |
| Q205 | 4/27/01 | Evidence of Inspections and Tests Performed By Seller |
| Q205P | 4/18/05 | Seller's Inspection / Acceptance Stamps for Procured Items |
| Q206 | 9/19/01 | Government Source Inspection |
| Q206S | 05/31/06 | Government Source Inspection (Variable Clause) |
| 11/3/04 | ||
| Q206W | 11/3/04 | Government Source Inspection With DD Form 250 (Variable Clause) |
| Q207 | 4/27/01 | Physical and Chemical Test Reports Identified to Specific Lots |
| Q208 | 4/27/01 | Evidence of Compliance with Reliability Verification Provisions |
| Q209 | 6/14/01 | Material Safety Data Sheet |
| Q210 | 12/09/02 | Supplier Designed Drawing Request (For Standard Catalog Hardware Only) |
| Q211 | reserved | |
| Q212 | 12/10/02 | Commercial Material Certification Identification |
| 4/27/01 | Material Certification Identification | |
| Q213 | 4/27/01 | Oxygen Compatibility Testing |
| Q214 | 4/27/01 | Change Control of Baseline Documents Contract Grouping Specification SSME (RL00144) or (RL10101) |
| Q215 | 8/6/01 | Records (SSME Program -- Purchased Labor Use Only) |
| Q216 | 7/16/01 | Weld Repairs of Castings |
| Q217 | 04/21/04 | Hazardous Materials Requirements -- Canoga Park |
| Q218 | 04/21/04 | Metallic -- Materials Acceptance Testing -- Canoga Park |
| Q219 | 4/27/01 | Material Review Record Inspection Discrepancy and Correction Record (IDCR) |
| Q219K | 05/31/06 | Seller Request For Buyer Disposition |
| 08/22/05 | ||
| Q219MM | 06/05/08 | Requested Material Review Board |
| Q219P | 4/18/05 | Nonconforming Material Control and Disposition |
| Q219S | 08/01/05 | Delegation of Material Review Authority -- 96X0005 |
| Q219W4 | 11/23/05 | Material Review (MR) Limitation - Connexion Program -- Deliverable |
| Q220 | 4/19/02 | Nondestructive Test Documentation Requirements SSME Program |
| Q221 | 4/27/01 | Special Procurement Quality Assurance Requirements |
| Q222 | 6/14/01 | Electrostatic Discharge Sensitive Protection |
| Q223 | 1/24/03 | QA -- Nondestructive Test (NDT) Source Inspection |
| Q224 | 11/27/01 | Inspection Record Retention (Five years) |
| Q224M | 07/21/08 | Record Retention |
| Q224P | 4/18/05 | Retention of Records |
| Q224S | 05/12/05 | Retention of Records |
| Q225 | reserved | |
| Q226 | 7/16/01 | Space Station Product Assurance Requirements |
| Q227 | 8/1/01 | Inspection Record Retention (Ten years) |
| Q228 | 11/22/02 | Inspection Requirements -- SSME Program Only |
| Q229 | 8/27/01 | Inspection Record Retention (SSME Program) |
| Q230-Q231 | reserved | |
| Q232 | 9/20/01 | Special Procurement Quality Assurance Requirements For Non-SSME Program Hardware |
| Q233 | 10/16/01 | Nondestructive Inspection for Space Station Hardware |
| Q234 | reserved | |
| Q235 | 11/22/02 | Characteristic Risk Analysis / Characteristic Accountability Worksheet -- SSME Program Only |
| Q236 | 4/30/01 | Space Station EEE Hardware -- Evidence of Lot Date |
| Q237 | 6/14/01 | Requirements for Printed Wiring Boards/Flex Circuits (RS68 Program Only) |
| Q238 | 6/14/01 | Requirements for Process Producibility Analysis (PPA) Testing of Multilayers (RS68 Program Only) |
| Q239C | 02/07/05 | Non-Metallic Materials Acceptance Testing -- Canoga Park |
| 06/21/04 | ||
| Q240-Q242 | reserved | |
| Q243 | 8/21/01 | Tool Accuracy Requirement |
| Q244-Q270 | reserved | |
| Q271 | 04/21/04 | AS9102 Aerospace First Article Inspection Requirement with Boeing First Article Inspection (BFAI) and Deliverable Report -- Canoga Park |
| Q272S1 | 11/23/05 | Quality Assurance Requirements -- Buy-To-Packages -- SDB Program |
| Q273S1 | 11/23/05 | Quality Assurance Requirements -- Build-To-Packages -- SDB Program |
| Q274 | reserved | |
| Q275SS | 11/23/05 | |