Q007 |
International
Space Station Program Supplement to BQMS Appendix A - Rev 12/14/01 |
In addition to the "Boeing Quality Management System for Suppliers"
(BQMS) D6-82479, Appendix A, the following Quality System criteria
is imposed on this contract to insure supplier compliance to NASA's
International Space Station Program (ISS) Quality System requirements.
|
AS9100
Issued
1999-11
Section |
|
2.1 |
EFFECTIVITY
Unless otherwise specified, the applicable issue of this document
will be the issue in effect on the date of supplier's acceptance
of the contract. |
2.2 |
INQUIRIES
Inquiries concerning this document, or requirements herein
shall be directed in writing to the Buyer. |
3 |
DEFINITIONS
For the purposes of work performed under this document, the
definitions given in ISO 8402 and AS 9100 shall apply. |
4.4 |
MILESTONE
REVIEWS
Supplier procedures shall identify Quality Assurance (QA)
and Software Quality Assurance (SQA) activities to include
supporting internal and supplier design reviews, buyer,
NASA and NASA's International Partners (as applicable) design
and readiness reviews. Milestone reviews (such as design,
acceptance, and readiness reviews) and other reviews shall
evidence Supplier QA and SQA participation to assure that
QA and SQA requirements are adequately considered.
Quality
Assurance participation in reviews shall assure that quality
requirements are considered in decisions which affect hardware
design, configuration controls, initiation of subsystem
and integrated testing, shipment, and readiness for flight.
Quality
Assurance data presented will contain sufficient detail
to allow management to assess the acceptability to proceed
with the next program phase activity.
|
4.5 |
PROCUREMENT
Changes. The seller (including proprietary sources under source
drawing control) shall notify the Buyer's Authorized Procurement
Representative of any proposed changes in fabrication, materials,
methods, product operating characteristics, or processes previously
approved and shall obtain written approval from the Buyer's
Authorized Procurement Representative before making the change.
Proprietary sources not under source drawing control shall
notify the Buyer's Authorized Procurement Representative of
any changes in fabrication materials, methods, product operating
characteristics, or process prior to delivery. |
4.6.2b |
SELECTION
OF SELLERS
A pre-award survey of the supplier's sub-tier contractor
facility and quality system shall be conducted in accordance
with documented procedures, developed by the supplier, to
determine if the supplier's sub-tier contractor is capable
of satisfying procurement quality requirements. The results
of supplier's pre-award surveys of supplier's sub-tier contractor
shall be documented and maintained on file.
When
articles or materials are/were fabricated by supplier's
sub-tier contractor(s) for NASA (or associated international
participants), or applicable Department of Defense (DOD)
contracts that have current acceptable surveys, a pre-award
survey is not required. Applicable DOD contracts are those
requiring implementation of MIL-Q-9858 or MIL-I-45208, as
appropriate.
Supplier's
sub-tier contractors or providers of off-the-shelf and industry
standard products or services which are non-critical/non-complex
and for which compliance with purchase order requirements
can adequately be determined upon receipt, shall not require
a quality pre-award review, survey or evaluation. Verification
of compliance to purchase order requirements shall be accomplished
during buyer's receiving inspection/test.
|
4.6.3 |
PROCUREMENT
DOCUMENTS REVIEW
The supplier shall submit procurement documents to the designated
government quality representative for GSI determination
prior to procurement release for the following purchase
types: 1. Purchases for products or services that are either
complex or have critical application and for which conformance
to contract requirements cannot or should not, for economical
reasons, be fully determined on receipt, or 2. Purchases
requiring direct shipment from the supplier to the government.
However,
supplier procurement documentation for products or services
for which conformance to contractual requirements may be
adequately determined by the supplier upon receipt do not
require submittal to the government quality representative
prior to release, but shall be available for review. Source
inspection performed by and for the convenience of the government
shall not replace supplier source inspection or relieve
the supplier of the responsibility for ensuring product
quality.
|
4.6.4.1 |
TEST
CONTROLS
Acceptance Review (AR). Supplier Quality Assurance shall participate
in ARs to assure compliance with documentation requirements.
The following information items shall be provided and readily
available for review at the AR:
A summary of tests and checkout operations and results
with anomalies encountered, failure history, remedial
actions, and recurrence control.
The status of any open work, including, but not limited
to, open items from previous reviews, shortages, non-conformances,
unincorporated engineering changes, and constraints on
further activities.
Identification of waivers/deviations and verification
of approvals. · Identification of limited life
components and their remaining life.
A comparison of as designed versus as built configuration
listings and rationale for any differences from approved
baseline.
Test Procedures and test data for all end item acceptance
tests including strip charts, deviations and other data
applicable to evaluate test records.
Completed deliverable Acceptance Data Package(s) (ADP's)
A DD250 or other contractually authorized document prepared
for signature.
Records of all open non-conformances occurring during
manufacturing and test of the end-item.
Handling , shipping, storage, preservation, and packaging
instructions, including environmental constraints, identification
of hazards and maintenance requirements and user manuals.
Additionally
all supporting documentation, which may be required to establish
equipment acceptability, should be readily retrievable. This
includes, but is not limited to, engineering drawings, schematics,
supplier ADP's , test specifications, closed non-conformances,
fabrication and inspection test records. |
4.8 |
IDENTIFICATION
AND DATA RETRIEVAL
Each article and material shall be identified by a unique
part or type number, and as applicable, one or more of the
following detailed identification methods:
Manufacturer's
Contractor and Government Entity (CAGE) code and date
codes indicating date of manufacture to identify articles
or materials made by a continuous and controlled process
and those which are subject to variation or degradation
with age.
Manufacturer's CAGE code and lot numbers to identify individual
materials or articles produced in homogeneous groups.
Serial numbers to identify materials or articles for which
unique data are to be maintained. Controls shall be included
to assure serial numbers are assigned in a consecutive
manner, gaps in serial numbers permitted.
Standard usage hardware (e.g. non-high strength fasteners,
shims, pins) which are not safety or functionally critical
and fall outside the date code, lot number, and serial
number screens shall require part or type number traceability
only.
Other
identification methods, such as paint dots, etc., shall
be approved by the buyer or a designated representative.
Methods
of application and location of part or type numbers and
detailed identification on articles shall be indicated
in engineering drawings and/or specifications.
Records
shall indicate detailed identification and be organized
so that records and the related article or material may
be located and retrieved as necessary.
Requirements
shall be established for Electrical, Electronic, and Electromechanical
(EEE) parts which will provide the capability of tracing
backwards from fabricated hardware to the lot from which
the part originated.
|
4.9.1 |
CONTROL
OF TEMPORARY INSTALLATIONS AND REMOVALS
Supplier Quality Assurance shall maintain a log or otherwise
ensure the management and control of articles or components
that are temporarily installed or removed to facilitate manufacturing,
testing, shipping, or handling of the Contract End Item. The
control shall be initiated upon installation or removal of
the first temporarily installed or removed item and shall
be maintained through delivery to prevent them from becoming
a part of the final configuration. |
4.9.2 |
TRAINING
Personnel performing or inspecting special processes shall
be trained and certified. |
4.10 |
TEST
PROCEDURES
Assure that test procedures include the following information:
Nomenclature
and identification of the test article or material.
Characteristics and design criteria including values and
tolerances for acceptance and rejection.
Identification
of characteristics and design criteria specified for verification.
Detailed
steps and operations to be taken in sequence including
verifications to be made before proceeding.
Identification
of measuring or NDE (Nondestructive Evaluation) equipment
to be used specifying range and type.
Details
or instructions for operation of special data recording
equipment.
Layout
of interconnection of test equipment and articles.
Identification
of hazardous situations or operations.
Precautions
to comply with established safety requirements, ensure
safety of personnel, and to prevent damage or degradation
of articles and measuring equipment.
Environments
and other conditions to be maintained.
Identification of any reference drawings, specifications,
workmanship standards, and/or reference documents required
to enable full comprehension of test requirements.
Constraints
on inspection or testing.
Special
instructions for nonconformance, anomalous occurrences,
or results.
Details
of sampling plans used.
Details
of Non Destructive Tests / Evaluations (NDT/E).
Identification
of steps that involve critical items or requirements.
Configuration/revision
level of hardware/software used during test.
|
4.10.1 |
QUALITY
ASSURANCE DESIGNEES
The selected inspection and test functions shall exclude using
Quality Assurance Designee's for those processes, inspections,
and tests that are required to verify critical characteristics
or where re-inspection cannot be readily accomplished due
to further assembly or installation of hardware. |
4.12 |
STAMP
CONTROLS
ELECTRONIC DATA CONTROL
Verification/validation/acceptance requirements for computerized
data entry and retrieval systems and computer generated
drawings and documents shall address alternatives to stamp
use for certification.
STAMPING/MARKING APPLICATION
Stamps shall be applied to tags, cards, or labels or attached
to individual articles and materials or their containers
as appropriate.
|
4.13.2 |
NONCONFORMING
ARTICLES AND MATERIALS
Repair per Standard Repair Procedure (SRP). Repair per SRP
is allowed only if the Material Review Board (MRB) has previously
approved the SRP. Limitations for use shall be specified
on each SRP. The existence of standard repair procedures
shall not relieve the contractor of the responsibility for
initiating preventive action to the fullest extent.
PROBLEM
REPORTING
A closed-loop system shall be provided for reporting and
correcting problems. Detailed requirements for problem reporting,
analysis, and resolution shall be in accordance with contract
data requirements.
|
4.13.2.4 |
MATERIAL
REVIEW BOARD ACTION
MRB membership and the disposition and control of affected
hardware shall be based on the following: The MRB shall be
comprised of at least one representative whose primary responsibility
is engineering, one representative from the seller's Quality
Assurance organization, and a designated Buyer Quality Assurance
Representative. MRB members may consult with other organizations
and personnel, as required, to arrive at optimum decisions.
|
4.15.2 |
HOISTING
OR LIFTING EQUIPMENT
Hoisting, or lifting equipment (e.g. slings) shall be prominently
marked to indicate the maximum load capacity and the due date
of the next rated or periodic load test. Quality Assurance
personnel will verify that the required test and maintenance
are accomplished within the specified frequency. |
|
|