Test & Evaluation
Coordination and Planning
BIA
Number: 14300.2
Pricing
Information
The
Program anticipates a funding level of up to $100,000 for the contract
award(s) resulting from this BIA.
Detailed
Description of Effort and Task
The
Future Combat Systems (FCS) program requires Test & Evaluation Coordination
Planning. This consists of support for FCS Test and Evaluation planning,
trade studies, lab architecture, integration, assessment and reporting,
and modeling and simulation strategy.This BIA requests a proposal
for the details and necessary resources, plans, etc. to accomplish
the below SOW tasks.
Task
1
Test
and Evaluation Resources and Facilities Master Plan
The Offeror
shall provide support FCS Test and Evaluation (T&E) with tasks and
activities in the areas of program planning, laboratory and test site
evaluation and planning, and test data handling requirements (including
prediction, evaluation, reporting, data storage/distribution), and
target system requirements.
Task
2
Test
and Evaluation Resources and Facilities Trade Studies
Contractor
shall develop trade studies to support the development of test and
evaluation resource requirements. Trade studies will include the planning,
execution, and documentation deemed necessary by the Boeing Company.
Contractor shall provide coordination of trade study results in the
development of the T&E planning documents.
Task
3
Interconnected
Lab/Test Site Architecture
The Offeror
shall support the development of an interconnected laboratory and
test site architecture. The Offeror shall develop communication network
concepts in support of FCS Laboratories and Test Sites. The Offeror
shall support the test framework software activities including requirements
definition. The Offeror shall support integration activities associated
with the pertinent organizations including the U.S. Army and DARPA
organizations/bases/laboratories, LSI combat systems and C4ISR developers.
Task
4
Test
and Evaluation Models and Simulations Strategy
The Offeror
shall perform systems engineering functions in support of the development
of T&E models and simulations. The Offeror shall define and evaluate
T&E models and simulations requirements and interface specifications.
The Offeror shall investigate existing laboratory and proving ground
facilities and capabilities, including Government provided models
and simulations, for re-use and adaptation to fulfill FCS T&E requirements.
The Offeror shall develop, document, implement and support T&E models
and simulations processes and procedures, JTA and CMM/SEI standards,
configuration management, and security plan. The Offeror shall analyze
T&E models and simulations components and test articles to verify
interface compatibility and integrate these items into the facility
infrastructure. The Offeror shall support T&E models and simulations
integration and evaluate/analyze test data associated with integration
activities.
Task
5
ROM
Cost Models
The contractor
shall produce ROM cost models for the proposed FCS test planning and
execution activities to include development of test plans and procedure,
test conduct, and test data analysis.
Schedule
and duration of on-site support - N/A
Number,
duration(s) and location(s) of meetings
Initial
Coordination / Kickoff Meeting - 10/10 thru 10/11/02
Interim
Coordination Meeting - 11/29/02
Final
Coordination Meeting - 5/16/03
Schedule
Milestones
Subcontract
Start Date - 10/9/02
Subcontract
Completion Date - 7/31/03
Data
Requirements
Initial
input - 11/29/02
Final
input - 7/16/03
Deliverables
- Draft
Integrated Test and Evaluation Plan - Initial 11/29/02; Final 5/16/03
- T&E
Trade Studies - Initial 11/29/02; Final 5/16/03
- Interconnected
Lab/Test Site Requirements- Initial 2/14/03; Final 5/16/03
- T&E
Models and Simulations Strategy - Initial 11/29/02; Final 12/17/02
- Test
Planning and Execution ROM Cost Models - Initial 2/14/03; Final
5/16/03
Evaluation
Criteria
Offerors
should ensure that their proposals address the following:
- Demonstrated
credibility of the proposed technical approach
- Degree
of understanding of the technical aspects of the work and related
issues
- Relevance
and history of performing similar work
- Availability
of resources to successfully conduct the proposed work.
- Responsiveness
to general BIA instructions
We will
apply these considerations to the following areas:
- Development
of system integration lab technology
- Analytical
and manufacturing capabilities associated with applicable system
of systems development (including modeling, simulation, and test)
- Test
framework specification development
- Suitability
to perform as a future SOSIL developer and integrator