Switchable Vision
Block
BIA
Number: 17000.4
Pricing
Information
The
Program anticipates a funding level of up to $60,000 for the contract
award(s) resulting from this BIA.
Detailed
Description of Effort and Task
To
coordinate, define, and refine the Future Combat Systems (FCS) training
concept, training approach, and FCS training tasks.
The Future
Combat Systems (FCS) training program is planning on utilizing the
systems powerful computing properties to perform embedded training
for most of the recurring training within the Army's Objective Force.
Within the FCS distributed networked system of systems (SoS), the
use of a vision block in simulation is an area of concern.
The FCS
program is interested in receiving descriptions of existing capabilities
and experience in the use of devices which will provide a means of
viewing simulated environment through a real world display. Of particular
interest are the following:
- What
is the best method to ensure that simulated scenarios may be displayed
in a switchable real-time display?
- What
method can be used to ensure that the simulated and real-time environments
are synchronized to reduce or alleviate motion sickness?
- Is
switchable Vision Block the correct solution?
Schedule
and duration of on-site support - None
Schedule
Milestones
Subcontract
Start Date - 10/15/02
Subcontract
Completion Date - 12/01/02
Initial
Coordination Meeting - 10-20-02
Interim
Coordination Meeting 11/10/02
Final
Coordination Meeting 11/22/2
Data
Requirements
Initial
input - 10/25/02
Final
input - 11/2502
Deliverables
A
report describing method of conducting training in a joint/coalition
environment using innovative ideas that will describe existing capabilities
and experience in the use of devices that will provide a means of
viewing simulated environment through a real world display. Of particular
interest are the following: What is the best method to ensure that
simulated scenarios may be displayed in a switchable real-time display?
What method
can be used to ensure that the simulated and real-time environments
are synchronized to reduce or alleviate motion sickness? Is switchable
Vision Block the correct solution? The report should present any study
already completed (or one in process), and methods to address these
topics.
Evaluation
Criteria
Offerors
should ensure that their proposals address the following:
- Demonstrated
credibility of the proposed technical approach
- Degree
of understanding of the technical aspects of the work and related
issues
- Relevance
and history of performing similar work
- Availability
of resources to successfully conduct the proposed work.
- Responsiveness
to general BIA instructions
We will
apply these considerations in the following areas:
- Use
of modeling and simulation in the weapon system.
- Understanding
of combining modeling with real-time events.