Image Gallery
Terms and Conditions of Image Use
GlobalTanker
The Remote Aerial Refueling Operators Station (RARO) for the first Boeing KC-767 is tested in the Boeing Systems Integration Laboratory (SIL) prior to the December 2004 installation on the aircraft.
Photo Credit: Boeing photo
Neg. #DVD-845-11
