Boeing Conducts Wind Tunnel Tests on Modified 747s
EVERETT, Wash., Oct. 13, 2003 -- The first round of wind tunnel testing on a modified 747-400 show the proposed design is an effective solution for transporting large assemblies to the 7E7 final assembly site. Testing at the University of Washington wind tunnel verified the performance characteristics of the airplane in flight.
###
Photo Credit: Ken DeJarlais
Neg #: 031013g1
These images are available for editorial use by news media on: boeingmedia.com
NOTE:
BCA photo release images are available on boeingmedia for 12 months from their release date. For older release images, contact BCA Visual Communications Manager, Seattle Fax +206 766 2934
