
|
April 20 - The Integrated Launch Vehicle is transferred from the assembly plant in the Sea Launch Commander to the top of the Odyssey Launch Platform, a lift of about 200 feet. The rocket remains in a horizontal position in the hangar (the white structure on the platform) during transit to the launch site on the Equator. |