Surface Water
The Regional Water Quality Control Board, Los Angeles Region (Regional Board) issued a 13304 Order on December 3, 2008 to perform interim/source removal actions to remove wastes that are causing or contributing to violations of limitations contained in the NPDES Permit, Order No. R4-2004-0111, in the Outfalls 008 and 009 Drainage areas. Site-wide cleanup of soil, soil vapor, and groundwater is not part of the scope of this Order and these activities will continue under regulatory oversight by the DTSC.
- ISRA Performance Monitoring and BMP Monitoring for the Outfalls 008 and 009 Watersheds, 2014/2015 Rainy Season
- 2014/2015 Rainy Season Sampling and Analysis Plan (SAP) Updates, Best Management Practice (BMP) Monitoring and Performance Monitoring Programs for the Outfalls 008 and 009 Watersheds
- 2014 Best Management Practices (BMP) Plan Addendum to the October 2010 Santa Susana Site Outfalls 008/009 Watersheds BMP Plan
- ISRA Performance Monitoring and BMP Monitoring for the Outfalls 008 and 009 Watersheds, 2013/2014 Rainy Season
- ISRA Phase III Implementation Report, 2011-2013 Activities
- Text, Tables, and Figures, Part 1 of 3opens in a new tab
- Figures, Part 2 of 3opens in a new tab
- Figures, Part 3 of 3opens in a new tab
- Appendix A Project Correspondenceopens in a new tab
- Appendix B Waste Certifications, Part 1 of 3opens in a new tab
- Appendix B Waste Certifications, Part 2 of 3opens in a new tab
- Appendix B Waste Certifications, Part 3 of 3opens in a new tab
- Appendix C Laboratory and Data Validation Reportsopens in a new tab
- Appendix D Biological Surveysopens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, Part 1 of 6opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, Part 2 of 6opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, Part 3 of 6opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, Part 4 of 6opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, Part 5 of 6opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, Part 6 of 6opens in a new tab
- Appendix F Boring Logs and Trench Logsopens in a new tab
- Appendix G Photo Logs, Part 1 of 3opens in a new tab
- Appendix G Photo Logs, Part 2 of 3opens in a new tab
- Appendix G Photo Logs, Part 3 of 3opens in a new tab
- Appendix H BFD and Feature Removal Logs, Part 1 of 2opens in a new tab
- Appendix H BFD and Feature Removal Logs, Part 2 of 2opens in a new tab
- Appendix I Offsite Disposal Recordsopens in a new tab
- Appendix J Topo Surveys, Part 1 of 2opens in a new tab
- Appendix J Topo Surveys, Part 2 of 2opens in a new tab
- 2013/2014 Rainy Season Sampling and Analysis Plan (SAP) Updates, BMP Monitoring and ISRA Performance Monitoring Programs
- ISRA Performance Monitoring and BMP Monitoring for the Outfalls 008 and 009 Watersheds 2012/2013 Rainy Season
- 2012 Best Management Practices (BMP) Plan Addendum
- ISRA Performance Monitoring and Potential BMP Subarea Monitoring for the Outfalls 008 and 009 Watersheds, 2011/2012 Rainy Season
- 2011-2012 Rainy Season SAP, Potential BMP Monitoring and Performance Monitoring Programs for the Outfall 008 and 009 Watersheds
- Expert Panel Presentation, Biofilter/BMP Tour - March 20, 2013opens in a new tab
- Expert Panel Presentation, RWQCB Site Tour - October 6, 2011opens in a new tab
- Final 2011 BMP Plan Addendumopens in a new tab
- Expert Panel Public Meeting (1-33) August 25, 2011opens in a new tab
- Expert Panel Public Meeting (34-57) August 25, 2011opens in a new tab
- ISRA Performance Monitoring and Potential BMP Subarea Monitoring for the Outfalls 008 and 009 Watersheds, 2010/2011 Rain
- Phase II Implementation Report - 2010 Activities, Errata Package
- Cover Letteropens in a new tab
- Appendix C Topographic Surveys, part 1 of 6 (Errata)opens in a new tab
- Appendix C Topographic Surveys, part 2 of 6 (Errata)opens in a new tab
- Appendix C Topographic Surveys, part 3 of 6 (Errata)opens in a new tab
- Appendix C Topographic Surveys, part 4 of 6 (Errata)opens in a new tab
- Appendix C Topographic Surveys, part 5 of 6 (Errata)opens in a new tab
- Appendix C Topographic Surveys, part 6 of 6 (Errata)opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 1 of 5 (Errata)opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 2 of 5 (Errata)opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 3 of 5 (Errata)opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 4 of 5 (Errata)opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 5 of 5 (Errata)opens in a new tab
- Phase II Implementation Report - 2010 Activities
- Text and Tableopens in a new tab
- Figures, part 1 of 3opens in a new tab
- Figures, part 2 of 3opens in a new tab
- Figures, part 3 of 3opens in a new tab
- Appendix A Regulatory Correspondence, part 1 of 5opens in a new tab
- Appendix A Regulatory Correspondence, part 2 of 5opens in a new tab
- Appendix A Regulatory Correspondence, part 3 of 5opens in a new tab
- Appendix A Regulatory Correspondence, part 4 of 5opens in a new tab
- Appendix A Regulatory Correspondence, part 5 of 5opens in a new tab
- Appendix B Waste Certificationsopens in a new tab
- Appendix C Topographic Surveys, part 1 of 5opens in a new tab
- Appendix C Topographic Surveys, part 2 of 5opens in a new tab
- Appendix C Topographic Surveys, part 3 of 5opens in a new tab
- Appendix C Topographic Surveys, part 4 of 5opens in a new tab
- Appendix C Topographic Surveys, part 5 of 5opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 1 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 2 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 3 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 4 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 5 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 6 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 7 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 8 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 9 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 10 of 11opens in a new tab
- Appendix D Boring Logs and Trench Logs, part 11 of 11opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 1 of 5opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 2 of 5opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 3 of 5opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 4 of 5opens in a new tab
- Appendix E Pre- and Post-Excavation Figures and Tables, part 5 of 5opens in a new tab
- Appendix F Offsite Disposal Records, part 1 of 6opens in a new tab
- Appendix F Offsite Disposal Records, part 2 of 6opens in a new tab
- Appendix F Offsite Disposal Records, part 3 of 6opens in a new tab
- Appendix F Offsite Disposal Records, part 4 of 6opens in a new tab
- Appendix F Offsite Disposal Records, part 5 of 6opens in a new tab
- Appendix F Offsite Disposal Records, part 6 of 6opens in a new tab
- Appendix G Laboratory and Data Validation Reportsopens in a new tab
- Appendix H Pipeline Removal Documents, part 1 of 2opens in a new tab
- Appendix H Pipeline Removal Documents, part 2 of 2opens in a new tab
- Appendix I Photo Appendix, part 1 of 2opens in a new tab
- Appendix I Photo Appendix, part 2 of 2opens in a new tab
- Appendix J Phase II Implementation Biological Reportopens in a new tab
- January 22, 2011 Presentation and Tour of Outfall 008 & 009 BMPs By Expert Panel
- Addendum to Field Protocols for Collecting ISRA Performance Monitoring RWQCB Split Samplesopens in a new tab
- 2010-2011 Best Management Practices and Interim Source Removal Action Performance Monitoring Sampling and Analysis Plan for 008/009 Watershedsopens in a new tab
- Expert Panel Memo - Recommended Procedures for Road Closures in the Outfall 008 and 009 Watershedsopens in a new tab
- Outfalls 008 and 009 Watersheds Best Management Practices Planopens in a new tab
- RWQCB Approval of the ISRA 2010 Boeing Soil Borrow Areaopens in a new tab
- Surface Water Expert Panel Report on ISRA Performance Monitoring Sampling Planopens in a new tab
- 2010 Boeing Soil Borrow Area Memorandumopens in a new tab
- Revision to Traffic Control Procedures for Soils Removed during ISRAopens in a new tab
- Addendum to ISRA Transportation Plan to add additional disposal facilityopens in a new tab
- 2010 Outfall 009 ISRA Waste Characterization Data
- AP/STP-1C-1 (Non-Hazardous, Radionuclides > LUT) Soil Sampling for Radionuclides and Waste Certificationopens in a new tab
- AP/STP-1B, -1C-1, -1C-2 and -1E-2 Radiological Certificationopens in a new tab
- AP/STP 1A Chemical Certificationopens in a new tab
- AP/STP 1A Radiological Certificationopens in a new tab
- AP/STP 1B Chemical Certificationopens in a new tab
- AP/STP 1C1 [East] Chemical Certificationopens in a new tab
- AP/STP 1C1 [Main] Chemical Certificationopens in a new tab
- AP/STP 1C1 [West] Chemical Certificationopens in a new tab
- AP/STP 1C2 [East] Chemical Certificationopens in a new tab
- AP/STP 1C2 [Main] Chemical Certificationopens in a new tab
- AP/STP 1C2 [West] Chemical Certificationopens in a new tab
- AP/STP 1D Chemical Certificationopens in a new tab
- AP/STP 1D Radiological Certificationopens in a new tab
- AP/STP 1E1 Chemical Certificationopens in a new tab
- AP/STP 1E1 Radiological Certificationopens in a new tab
- AP/STP 1E2 Chemical Certificationopens in a new tab
- AP/STP 1E3 Chemical Certificationopens in a new tab
- AP/STP 1E3 Radiological Certificationopens in a new tab
- AP/STP 1F Chemical Certificationopens in a new tab
- AP/STP 1F Radiological Certificationopens in a new tab
- B1-1A Locationopens in a new tab
- B1-1B Locationopens in a new tab
- B1-1C Locationopens in a new tab
- B1-1D Locationopens in a new tab
- CTL I - 1A Locationopens in a new tab
- CTL I - 1B Locationopens in a new tab
- IEL - 1 Locationopens in a new tab
- IEL - 2 Locationopens in a new tab
- Soil Sampling for Radiological Waste Certification, B1-1 Location, Rev. 1opens in a new tab
- B1 Buried Pipe Waste Certification opens in a new tab
- B1-2 Chemical Waste Certificationopens in a new tab
- B1-2 Radiological Certificationopens in a new tab
- B1-2 Stockpile Radiological Certificationopens in a new tab
- Soil Sampling for Radiological Waste Certification, CTL I Location, Rev. 1opens in a new tab
- Soil Sampling for Radiological Waste Certification, IEL-1 Location, Rev. 0opens in a new tab
- Soil Sampling for Radiological Waste Certification, IEL-2 Location, Rev. 0opens in a new tab
- IEL-3 Chemical Waste Certificationopens in a new tab
- IEL-3 Below LUT Soil Cert Rev 8opens in a new tab
- June 30, 2010 RWQCB Approval of the 2010 ISRA Work Plan Addendumopens in a new tab
- Response to RWQCB and comments on the 2010 ISRA Work Plan Addendumopens in a new tab
- 2010 ISRA SWPPP part 1 of 2opens in a new tab
- 2010 ISRA SWPPP part 2 of 2opens in a new tab
- 2010 Addendum ISRA HASPopens in a new tab
- 2010 Addendum ISRA Soil Management Planopens in a new tab
- 2010 Addendum to the ISRA Transportation Planopens in a new tab
- 2010 ISRA Work Plan Addendum
- Postponement of ELV Cleanup Actions opens in a new tab
- Waste Acceptance Profilesopens in a new tab
- NASA Announces Additional Soil Cleanup at Santa Susana Field Labopens in a new tab
- Intent to initiate ISRA Actions at ELV opens in a new tab
- RWQCB Approval of ISRA Performance Monitoring Planopens in a new tab
- ISRA Performance Monitoring Planopens in a new tab
- Expert Panel Technical Report - Revegetation of Outfall 008 Watershedopens in a new tab
- RWQCB Approval of ISRA Work Plan Amendment to Include Work at A2LF-1 and A2LF-3 Located within the Watershed of Outfall 009opens in a new tab
- DTSC Concurrence with ISRA Work Plan Amendment to Include A2LF-1 and A2LF-3opens in a new tab
- CA Department of Public Health Correspondence - October 23, 2009opens in a new tab
- DTSC Letter to RWQCB - ELV Soil Disposal - October 19, 2009opens in a new tab
- RWQCB Approval of Plan to Remove Happy Valley Septic Tankopens in a new tab
- Response to RWQCB Comments on Additional Work for ISRA Outfall 009opens in a new tab
- HVS Septic Tank Removal Plan - Final opens in a new tab
- RWQCB Comments on the Characterization, Management and Disposal Plan for Outfall 009 ISRA ELV-1c and ELV-1d Areasopens in a new tab
- Outfall 008 ISRA Waste Characterization Data
- CYN-1 Locationopens in a new tab
- DRG-1 Locationopens in a new tab
- HVS-1 Locationopens in a new tab
- HVS2A Locationopens in a new tab
- HVS-2B1 Locationopens in a new tab
- HVS-2B1 Location (containerized)opens in a new tab
- HVS-2B2 Locationopens in a new tab
- HVS-2C Locationopens in a new tab
- HVS-3 Locationopens in a new tab
- HVS-4 Location opens in a new tab
- Stockpiled Soil From HVS-2D, HVS-3, and Excavation of the Natural Gas Pipeline Locationsopens in a new tab
- Outfall 008 Radionuclides Results and Statistical Analysis Waste Certification - Revision 4opens in a new tab
- Outfall 008 Radionuclides Results and Statistical Analysis Waste Certification - Revision opens in a new tab
- Outfall 008 Radionuclides Results and Statistical Analysis Waste Certificationopens in a new tab
- HVS Septic Tank Water Sampling for Radionuclides, Waste Certificationopens in a new tab
- Outfall 009 ISRA Waste Characterization Data
- ELV-1D (Pond, Shallow Soils) Chemical Certificationopens in a new tab
- ELV-1D (Pond, Deep Soils) Chemical Certificationopens in a new tab
- ELV-1D F-listed Above LUT Soil Certificationopens in a new tab
- LOX Debris Pile Below LUT Soil Certificationopens in a new tab
- LOX Debris Pile Chemical Certificationopens in a new tab
- ELV-1D F-listed Above LUT Soil Cert Rev 1opens in a new tab
- ELV-1D F-listed Below LUT Soil Cert Rev 2opens in a new tab
- LOX All Chem Below LUT Soil Cert Rev 1opens in a new tab
- LOX Non Haz Above LUT Soil Cert Rev 1opens in a new tab
- LOX-1B-1 Chemical Certificationopens in a new tab
- LOX-1B-2 Chemical Certificationopens in a new tab
- LOX-1B-3 Chemical Certificationopens in a new tab
- ELV-1C_Cal_Haz_Above_LUT_Soil_Cert_Rev_1opens in a new tab
- ELV-1C_Cal_Haz_Below_LUT_Soil_Cert_Rev_1opens in a new tab
- ELV-1C_Non_Haz_Above_LUT_Soil_Cert_Rev_1opens in a new tab
- ELV-1C_Non_Haz_Below_LUT_Soil_Cert_Rev_2opens in a new tab
- ELV-1C [NE] Locationopens in a new tab
- ELV-1C [SW] Location opens in a new tab
- ELV-1D [Drainage] Locationopens in a new tab
- A2LF-1 Locationopens in a new tab
- A2LF-3 Locationopens in a new tab
- A2LF ISRA Soil Sampling for Radionuclides Waste Certificationopens in a new tab
- Boeing Response to RWQCB/DTSC comments on the ISRA SMP, Transportation Plan & HASP - Aug. 17, 2009
- Revised ISRA SWPPP per comments from RWQCB - Aug. 17, 2009
- RWQCB Comments on the ISRA SWPPP - Aug. 5, 2009opens in a new tab
- DTSC Comments to ISRA Soil Management Plan - Aug. 3, 2009opens in a new tab
- ISRA Soil Management Plan (Agency Review Copy)opens in a new tab
- ISRA Transportation Plan (Agency Review Copy)opens in a new tab
- ISRA Health and Safety Plan (Agency Review Copy)opens in a new tab
- ISRA Storm Water Pollution Prevention Plan (Agency Review Copy)
- RWQCB Final Approval of and Comments on Addendum to the Final ISRA Work Plan - July 7, 2009opens in a new tab
- Response to RWQCB and DTSC Comments on May 1, 2009 Final ISRA Work Plan - June 19, 2009opens in a new tab
- Final ISRA Work Plan - May 1, 2009
- RWQCB Approval of 10 Day Web Uploading Deadline - May 22, 2009opens in a new tab
- Clarifications to RWQCB Comments on Preliminary ISRA Work Plan - April 30, 2009 opens in a new tab
- RWQCB Comments on Preliminary ISRA Work Plan - April 20, 2009 opens in a new tab
- Preliminary ISRA Work Plan - Feb. 13, 2009opens in a new tab
- Boeing Letter Phase I Implementation Reportopens in a new tab
- ISRA Phase I 2009 Report.pdfopens in a new tab
- Tablesopens in a new tab
- Figuresopens in a new tab
- Appendix A Regulatory Correspondence part 1 of 6opens in a new tab
- Appendix A Regulatory Correspondence part 2 of 6opens in a new tab
- Appendix A Regulatory Correspondence part 3 of 6opens in a new tab
- Appendix A Regulatory Correspondence part 4 of 6opens in a new tab
- Appendix A Regulatory Correspondence part 5 of 6opens in a new tab
- Appendix A Regulatory Correspondence part 6 of 6opens in a new tab
- Appendix B Waste Certificationsopens in a new tab
- Appendix C Topographic Surveys Part 1 of 3opens in a new tab
- Appendix C Topographic Surveys Part 2 of 3opens in a new tab
- Appendix C Topographic Surveys Part 3 of 3opens in a new tab
- Appendix D Boring and Trench Logs part 1 of 6opens in a new tab
- Appendix D Boring and Trench Logs part 2 of 6opens in a new tab
- Appendix D Boring and Trench Logs part 3 of 6opens in a new tab
- Appendix D Boring and Trench Logs part 4 of 6opens in a new tab
- Appendix D Boring and Trench Logs part 5 of 6opens in a new tab
- Appendix D Boring and Trench Logs part 6 of 6opens in a new tab
- Appendix E Pre and Post Excavation part 1 of 3opens in a new tab
- Appendix E Pre and Post Excavation part 2 of 3opens in a new tab
- Appendix E Pre and Post Excavation part 3 of 3opens in a new tab
- Appendix F Offsite Disposal Records part 1 of 2opens in a new tab
- Appendix F Offsite Disposal Records part 2 of 2opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 1 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 2 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 3 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 4 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 5 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 6 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 7 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 8 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 9 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 10 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 11 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 12 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 13 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 14 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 15 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 16 of 21 opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 17 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 18 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 19 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 20 of 21opens in a new tab
- Appendix G Laboratory and Data Validation Rpt part 21 of 21opens in a new tab
- Appendix H HVS Septic Tank Removal Documentsopens in a new tab
- Appendix I - Photo Appendix part 1 of 2 opens in a new tab
- Appendix I - Photo Appendix part 2 of 2opens in a new tab
- Appendix J SWPPP Sample Resultsopens in a new tab
- Appendix K Culvert Design Diagramsopens in a new tab
- 3rd Quarter 2014 Progress Reportopens in a new tab
- 2nd Quarter 2014 Progress Reportopens in a new tab
- 1st Quarter 2014 Progress Reportopens in a new tab
- 4th Quarter 2013 Progress Reportopens in a new tab
- 3rd Quarter 2013 Progress Reportopens in a new tab
- 2nd Quarter 2013 Progress Reportopens in a new tab
- 1st Quarter 2013 Progress Reportopens in a new tab
- 4th Quarter 2012 Progress Reportopens in a new tab
- 3rd Quarter 2012 Progress Reportopens in a new tab
- 2nd Quarter 2012 Progress Reportopens in a new tab
- 1st Quarter 2012 Progress Reportopens in a new tab
- 4th Quarter Progress Report - ISRA and BMP for September 17, 2011 thru December 16, 2011 Activityopens in a new tab
- 3rd Quarter Progress Report - ISRA and BMP for June 18, 2011 thru September 16, 2011 Activityopens in a new tab
- 2nd Quarter Progress Report for March 21, 2011 thru June 17, 2011 Activityopens in a new tab
- March 2011 Quarterly Progress Report for Dec 2010 thru Mar 2011 Activityopens in a new tab
- December 2010 Quarterly Progress Report for Sept. thru Dec. Activityopens in a new tab
- September 30, 2010 ISRA Quarterly Reportopens in a new tab
- June 30 2010 Qtr Progress Report Part 1 of 2opens in a new tab
- June 30 2010 Qtr Progress Report Part 2 of 2opens in a new tab
- March 31, 2010 Quarter Progress report for: Dec 19, 2009 - March 12, 2010opens in a new tab
- 4th Quarter ISRA Progress Report 2009opens in a new tab
- 3rd QTR ISRA Progress Report 2009opens in a new tab
- ISRA Quarterly Progress Report - June 30, 2009opens in a new tab